Skip to main content

Fall Creek Trail Reroute

This project proposes to eliminate the exposed section of trail by rerouting the trail over the slide-prone slope well above the steep bluff on terrain that is not slide prone. The total distance of this reroute will be about 0.85 mile.

Project Summary

Last Updated: 3/13/2014