Skip to main content

Hills Creek-Lookout Point Geotechnical Drill Project

This project proposes that testing would entail clearing & leveling two 40 ft by 10 ft work pads to set up the drilling equipment at each proposed structure location. This project is to determine foundation depth for future tower replacement.

Project Summary

Last Updated: 9/18/2014