Deer Creek Floodplain Enhancement
The project will consist of channel reconstruction and floodplain enhancement using wood placement and side channel excavation. Wood sources for the logs will be located within a 5 mile radius of the channel.
Project Summary
Location Summary:
The project area is approximately 42 acres and includes 1.6 miles of Deer Creek.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/10/2015 |
Decision | 04/2016 (Estimated) |
Implementation | 07/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
McKenzie River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management; Wildlife, Fish, Rare Plants; Vegetation Management (Other Than Forest Products)
Project Activity:
Species Habitat Improvements; Watershed Improvements
Current Status:
Completed
Project Decision Information
Deer Creek Floodplain Enhancement
Decision Signed Date: 04/22/2016
Forests:
Willamette National Forest
Districts:
McKenzie River Ranger District
States:
Oregon
Counties:
Linn
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kate Meyer
57600 McKenzie Hwy
McKenzie Bridge, OR 97413
541-822-7230
kmmeyer@fs.fed.us
Last Updated: 4/28/2016