Skip to main content

Trail bridge Campground and Campus potable water system upgrade

Install a new 5000 gallon above ground water storage tank located adjacent to Bypass road. Provides water storage for TB campground and Carmen-s campus. Install a 3 inch water line connecting to new tank from location of old tank up to 450 linear fee

Project Summary

Last Updated: 12/10/2019