Skip to main content

Pipeline for BLM Petro Hunt USA 23

2.87 miles of 4 inch pipeline to connect wells on proposed Petro Hunt USA 32 into existing Petro Hunt USA 34 wells. Pipeline would be buried 3 feet deep; 9,077 feet would be trenched in the road right-of-way, 6,080 feet would be horizontally drilled.

Project Summary

Last Updated: 12/1/2020