Pipeline for BLM Petro Hunt USA 23
2.87 miles of 4 inch pipeline to connect wells on proposed Petro Hunt USA 32 into existing Petro Hunt USA 34 wells. Pipeline would be buried 3 feet deep; 9,077 feet would be trenched in the road right-of-way, 6,080 feet would be horizontally drilled.
Project Summary
Location Summary:
Compartment 104 on the Vernon Unit of the Calcasieu RD. NE 1/4 of section 23, T1S, R8W. Vernon Parish. Approximately 6.75 miles SE of Fort Polk, Louisiana.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 04/05/2016 |
| Decision | 06/2018 (Estimated) |
| Implementation | 09/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (17), 36 Cfr 220.6(E)(17)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Calcasieu Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations; Natural Gas; Oil
Current Status:
Cancelled
Forests:
Kisatchie National Forest
Districts:
Calcasieu Ranger District
States:
Louisiana
Counties:
Vernon
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Gretchen Moore
9912 Hwy 28 West
Boyce, LA 71409
318-473-7144
gretchenmoore@fs.fed.us
Last Updated: 12/1/2020