Uniti Fiber Optic Project
Installation of fiber optic cable in 1.25" conduit along the state right of way of LA Highway 156 to Goldonna Elementary School approximately 13.93mi or .47ac in distance. All cable will be placed by directional bore, 18" off of the back of ditch.
Project Summary
Location Summary:
Proposed route enters Kisatchie NF at 31.954358 latitude, -92.687707 longitude and continues 13.93 miles in right of way exiting at 32.001787 latitude, -92.896396 longitude.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/10/2021 |
Decision | 12/2021 (Estimated) |
Implementation | 01/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Winn Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Uniti Fiber Optic Project
Decision Signed Date: 12/07/2021
Forests:
Kisatchie National Forest
Districts:
Winn Ranger District
States:
Louisiana
Counties:
Natchitoches
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Errol Solomon
12319 U.S. Highway 84 West
Winnfield, LA 71483
225-771-4348
errol.solomon@usda.gov