Skip to main content

Norvado Winter Phase 2 Fiberoptic Installation

Norvado proposes to install fiberoptic line in about 0.4 of a mile of right-of-way on Forest Roads 1661BB and 1661AB with about 0.05 of an acre of soil disturbance.

Project Summary

Last Updated: 12/15/2025