0903 SU - Lake Country Power Amend 5 Shoal Lake

The overhead lines will be removed, and the existing material will be used to fill in the pole holes. The new underground will be located within the existing right of way and no additional tree clearing will be required. The cable will be buried directly into the soil using a vibratory cable plow. T

Project Summary