Skip to main content

0903 SU - Arrowhead Communications Amendment 5

Replacement of failed copper facility and installation of fiber optic mainline cable for future use. The cable will be buried at 35 inches. The right-of-way will be approximately 383 feet long and 10 feet wide. The installation is planned to occur in the spring/summer of 2026.

Project Summary

Last Updated: 12/17/2025