Skip to main content

0903 SU - East Seelye Bay Lot 2

Permittee proposes removing a non-compliant septic system and replacing it with a new system. A new 1,650-gallon combination precast concrete tank will be installed along with a lift station, 10’ x 38’ pressure bed drainfield, and connection pipes. No trees will be removed.

Project Summary

Last Updated: 6/4/2026