Skip to main content

0903 SU - Enbridge Amendment 5

Enbridge plans to conduct electrical work to connect the pipeline system to a newly installed transformer associated with a powerline relocation at Milepost 975.6 during the fall of 2026.

Project Summary

Last Updated: 8/24/2026