East Ottertail- Amendment 6 Longville

Installation and maintenance of 53,211 ft of line to be installed using a vibratory plow or directional bore under roadways and water ways. Much of the line is existing and is to be upgraded to better meet demands. partly within reservation.

Project Summary

Last Updated: 12/12/2023