Skip to main content

Deer Lake & Winnie Boat Access Channel Dredging

Authorize reoccurrence of equipment to excavate channel bottom sediment approximately 2ft in depth, 3-6ft in width, and 50-150ft in length. Sediment spoils will be deposited adjacent to previous spoils sites.

Project Summary

Last Updated: 2/5/2025