East Ottertail Amendment 13

The project is slated to occur in the Summer of 2026. It includes the installation of BD5 Pedestals and approximately 3429 feet of fiber in an existing right-of-way. The ROW will be 33 feet wide. The line will be plowed and directionally drilled.

Project Summary

Last Updated: 9/29/2025