Trunk Highway (TH) 38 Improvement Project
Construct a new road pavement, replace 41 and repair 9 culverts,repair the eroding inslope at 7 locations, raise the road surface at milepost 26, lower the crest hill at milepost 14.5, tree removal a some areas. Outside the LLBO reservation.
Project Summary
Location Summary:
TH38 north-south corridor between Pughole Lake to Marcell
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 11/25/2015 |
| Decision | 02/2017 (Estimated) |
| Implementation | 05/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Deer River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance
Current Status:
Completed
Project Decision Information
Trunk Highway (TH) 38 Improvement Project
Decision Signed Date: 02/21/2017
Forests:
Chippewa National Forest
Districts:
Deer River Ranger District
States:
Minnesota
Counties:
Itasca
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Barb Knight
1235 Division Street
Deer River, MN 56636
218-246-2362
bknight@fs.fed.us
Last Updated: 2/22/2017