Skip to main content

Greater MN Transmission LLC Pipeline Permit Request

New permit to install 3 inch natural gas pipeline along 371 corridor. Disturbance on National Forest System lands will be 30 feet wide by 376 feet long, or approximately 0.33 acres. No timber will be removed.

Project Summary

Last Updated: 3/30/2020