Skip to main content

Ten Section and Moss Lakes Fish Passage Project

The project includes removing two impoundment structures between Pike Bay and Moss Lake to restore fish passage. The structure on the outlet of Moss Lake would be replaced with a larger diameter culvert to increase flow capacity.

Project Summary

Last Updated: 8/23/2019