Skip to main content

South High Banks Lot 3

Removal of current shed, construction of a new 20%u2019x20%u2019 shed on the same site. Structure will be built on cinder block and require minimal ground disturbance. This project is within the Leech Lake Band of Ojibwe reservation boundary.

Project Summary

Last Updated: 5/4/2021