Skip to main content

Enbridge CAL401926 Temporary Permit Maintenance Dig

3 maintenance digs on Line 4. 2.5 acre temporary workspace and access outside of the current permit area for a 1 year term with vegetative restoration. All wetland areas will be fully matted with wood timber mats. no tree removal greater than 6 inch

Project Summary

Last Updated: 12/6/2023