Great Rive Energy Soil Boring
geo-technical soil boring at 4 locations which will temporarily use 10,000 sq ft of land within existing utility corridors. 3" diameter and up to 50' down for boring holes. No waste material left on site. Holes backfilled with native soil.
Project Summary
Location Summary:
West of Deer River off Hwy 2
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/14/2024 |
| Decision | 08/2024 (Estimated) |
| Implementation | 08/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Chippewa National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Great Rive Energy Soil Boring
Decision Signed Date: 08/01/2024
Forests:
Chippewa National Forest
Districts:
Deer River Ranger District
States:
Minnesota
Counties:
Itasca
Legal Land Description:
T147N, R25W, Sec. 12 & 24 and T146N, R25W Sec. 3
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Joshua Krecklau
200 Ash Avenue NW
Cass Lake, MN 56633
218-547-1044
Joshua.Krecklau@usda.gov
Last Updated: 8/2/2024