Eddington Creek Head-cut Repair
The face of head-cuts would be shaped smooth using handtools and covered with coir fabric mesh staked into place. Eroded pine would be used as a source of material to provide soil stability, grade control, and energy dissipation.
Project Summary
Location Summary:
Eddington Creek is a high quality cold-water trout stream that flows directly into the Manistee River about one mile downstream of Hodenpyle Dam.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/14/2014 |
Decision | 01/2015 (Estimated) |
Implementation | 01/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (19), 36 Cfr 220.6(E)(19)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Cadillac/Manistee Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Wildlife, Fish, Rare Plants; Watershed Management
Project Activity:
Watershed Improvements
Current Status:
Completed
Project Decision Information
Eddington Creek Head-cut Repair Project Decision Memo
Decision Signed Date: 01/16/2015
Forests:
Huron-Manistee National Forest
Districts:
Cadillac/Manistee Ranger District
States:
Michigan
Counties:
Manistee
Legal Land Description:
T23N, R13W, Section 26
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Chris Riley
1170 Nursery Road
Wellston , MI 49689
(231) 723-2211-3122
criley01@fs.fed.us
Last Updated: 3/26/2015