Great Lakes Energy FR7867 and FR9710
Installation of a new buried electrical line to a property that does not currently have it, and rebuilding a deteriorated electrical line while changing from overhead to buried. Both are in existing rights of way with minimal vegetation removal.
Project Summary
Location Summary:
Mason County, Branch Township, T18N R15W, Section 23 and Newaygo County, Merrill Township, T15N R13W, Section 14
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 04/20/2018 |
| Decision | 09/2018 (Estimated) |
| Implementation | 09/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Baldwin/White Cloud Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Great Lakes Energy FR7867 and FR9710
Decision Signed Date: 09/10/2018
Forests:
Huron-Manistee National Forest
Districts:
Baldwin/White Cloud Ranger District
States:
Michigan
Counties:
Mason; Newaygo
Legal Land Description:
Mason County, Branch Township, T18N R15W, Section 23 and Newaygo County, Merrill Township, T15N R13W, Section 14
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Katie Racey
650 North Michigan Ave.
Baldwin, MI 49304
231-745-4631 ex 3138
kracey@fs.fed.us
Last Updated: 9/27/2018