Great American Outdoors Act – Legacy Restoration Fund, Fiscal Year 2025 Deferred Maintenance Projects


All Regions, National Forests, & Research Stations

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
11, FOREST PRODUCTS LABORATORYFOREST PRODUCTS LABORATORYFOREST PRODUCTS LABORATORY WELCOME CENTERThis project will restore the Forest Products Laboratory main lobby to reflect the original architectural style.2ND WISCONSIN$1,120,000
12, INTERNATIONAL INSTITUTE OF TROPICAL FORESTRYINTERNATIONAL INSTITUTE OF TROPICAL FORESTRYINTERNATIONAL INSTITUTE OF TROPICAL FORESTRY ROOF REPLACEMENTSThis project will replace multiple roofs at the International Institute of Tropical Forestry Headquarters complex.98TH PUERTO RICO$1,100,000
22, ROCKY MOUNTAIN RESEARCH STATIONROCKY MOUNTAIN RESEARCH STATIONMISSOULA FIRE LAB COMBUSTION LABORATORY ELEVATOR REPLACEMENTThis project will replace a specialized elevator within the Missoula Fire Lab's combustion laboratory.1ST MONTANA$1,286,000
22, ROCKY MOUNTAIN RESEARCH STATIONROCKY MOUNTAIN RESEARCH STATIONPRIEST RIVER EXPERIMENTAL FOREST QUARTERS RENOVATIONSThis project will replace or upgrade finishes, mechanical systems, electrical systems, and parking areas. 1ST IDAHO$1,435,000
22, ROCKY MOUNTAIN RESEARCH STATIONROCKY MOUNTAIN RESEARCH STATIONSOUTHWEST FORESTRY SCIENCES LABORATORY MECHANCIAL SYSTEM IMPROVEMENTSThis project will provide reliable systems that will improve the operation and function of the building for improved cost efficiency.1ST ARIZONA$1,101,000
22, ROCKY MOUNTAIN RESEARCH STATIONROCKY MOUNTAIN RESEARCH STATIONDESERT EXPERIMENTAL RANGE HOUSING IMPROVEMENTSThis project involves the renovation of housing facilities at the Desert Experimental Range and restoration of key site utilities.2ND UTAH,
3RD UTAH
$580,000
24, NORTHERN RESEARCH STATIONNORTHERN RESEARCH STATIONRHINELANDER LABORATORY MECHANICAL SYSTEM REPLACEMENTThis project replaces the existing mechanical systems at the Rhinelander Forestry Sciences Laboratory with new energy efficient systems.7TH WISCONSIN$1,110,000
24, NORTHERN RESEARCH STATIONNORTHERN RESEARCH STATIONMORGANTOWN LABORATORY ROOF REPLACEMENTThis project will replace the main building’s roof.1ST WEST VIRGINIA, 2ND WEST VIRGINIA$670,000
24, NORTHERN RESEARCH STATIONNORTHERN RESEARCH STATIONBARTLETT EXPERIMENTAL FOREST HOUSING RESTROOM REMODELThis project will remodel the restroom facilities at the Barlett Experimental Forest housing.1ST NEW HAMPSHIRE, 2ND NEW HAMPSHIRE$600,000
24, NORTHERN RESEARCH STATIONNORTHERN RESEARCH STATIONHOUGHTON FORESTRY SCIENCES LABORATORY MECHANICAL SYSTEM UPGRADESThis project will improve the mechanical systems at the Houghton Forestry Sciences Laboratory.1ST MICHIGAN$454,000
26, PACIFIC NORTHWEST RESEARCH STATIONPACIFIC NORTHWEST RESEARCH STATIONLA GRANDE LABORATORY ACCESSIBILITY RENOVATIONThis project will renovate the La Grande Forestry Sciences Laboratory.2ND OREGON$690,000
27, PACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATIONPACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATIONREDWOOD SCIENCES LABORATORY ROOF REPLACEMENTProject will replace the roof on the Redwood Sciences Laboratory.1ST CALIFORNIA$720,000
27, PACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATIONPACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATIONPLACERVILLE STAFF HOUSE RENOVATIONThis project will renovate the primary housing facility at the Placerville site.4TH CALIFORNIA$600,000
33, SOUTHERN RESEARCH STATIONSOUTHERN RESEARCH STATIONSOUTHERN RESEARCH STATION EXPERIMENTAL FOREST WEIR REPAIRSThis project repairs weirs that support research across the Southern Research Station Experimental Forests.11TH NORTH CAROLINA, 6TH SOUTH CAROLINA$1,667,000
33, SOUTHERN RESEARCH STATIONSOUTHERN RESEARCH STATIONOXFORD FOREST HYDROLOGY LABORATORY RENOVATIONThis project will renovate the Oxford Forest Hydrology Laboratory.1ST MISSISSIPPI$994,000
33, SOUTHERN RESEARCH STATIONSOUTHERN RESEARCH STATIONCOWEETA HYDROLOGICAL LABORATORY LAB BUILDING RENOVATIONThis project will modernize the Coweeta Hydrological Laboratory.11TH NORTH CAROLINA$1,500,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R1, NORTHERN REGIONBEAVERHEAD-DEERLODGE NATIONAL FORESTGEORGETOWN LAKE BOAT LAUNCH PAVING DEERLODGE COUNTYThis project will replace the boat launches and associated parking located at the highly popular Georgetown Lake.1ST MONTANA$1,850,000
R1, NORTHERN REGIONBEAVERHEAD-DEERLODGE NATIONAL FORESTBIRCH CREEK CIVILIAN CONSERVATION CORPS CAMP AND RENTAL CABIN DEFERRED MAINTENANCE REDUCTIONThis project will repair one of the most intact 1930s Civilian Conservation Corps camps remaining in the nation.1ST MONTANA$435,000
R1, NORTHERN REGIONBITTERROOT NATIONAL FORESTDEVELOPED RECREATION PAVEMENT PROJECTSThis project addresses pavement maintenance at many popular campgrounds and recreation areas.1ST MONTANA$384,000
R1, NORTHERN REGIONBITTERROOT NATIONAL FORESTMAGRUDER CORRIDOR DEFERRED MAINTENANCEThis project will improve developed campgrounds, trailheads, and recreation facilities within the historic, unique and popular Magruder Corridor.1ST IDAHO,
1ST MONTANA
$1,206,000
R1, NORTHERN REGIONBITTERROOT NATIONAL FORESTSULA HOUSING & DISTRICT WATER SYSTEM IMPROVEMENTSThis project will replace the pumphouse, piping, and controls with a new water line, storage tank drain valve, and fire hydrant.1ST MONTANA$305,000
R1, NORTHERN REGIONBITTERROOT NATIONAL FORESTTRAIL BRIDGE DEFERRED MAINTENANCEThis project will replace or repair deficient bridges along multiple trail systems.1ST IDAHO,
1ST MONTANA
$461,000
R1, NORTHERN REGIONBITTERROOT NATIONAL FORESTFORESTWIDE QUARTERS DEFERRED MAINTENANCEThe project will address deferred maintenance at housing facilities across the Forest.1ST MONTANA$655,000
R1, NORTHERN REGIONIDAHO PANHANDLE NATIONAL FORESTSCOEUR D’ALENE CORRIDOR CAMPGROUND RENOVATIONSThis project will renovate two popular concessionaire operated campgrounds located within the Coeur d' Alene River Priority Area.1ST IDAHO$1,170,000
R1, NORTHERN REGIONIDAHO PANHANDLE NATIONAL FORESTSSAM OWEN CAMPGROUND RENOVATIONThis project will replace campground infrastructure, including fire rings, picnic tables, accessible living spaces, new asphalt throughout the campground as well as pull-through sites and camping spurs designed to accommodate recreational vehicles.1ST IDAHO$1,973,000
R1, NORTHERN REGIONIDAHO PANHANDLE NATIONAL FORESTSNORTH ZONE TRAIL DEFERRED MAINTENANCE- SALMO PRIEST WILDERNESS & RECOMMENDED WILDERNESSThe Salmo Priest Trail System is the only trail system in designated Wilderness on the forest. This project will involve tread repair and heavy brushing on numerous trails.1ST IDAHO, 5TH WASHINGTON$530,000
R1, NORTHERN REGIONIDAHO PANHANDLE NATIONAL FORESTSCENTRAL ZONE CANFIELD MOUNTAIN TRAILS DEFERRED MAINTENANCEThis project includes tread maintenance, rerouting, reconstruction, and new construction to accomplish a desired trail system that connects to an urban population.1ST IDAHO$773,000
R1, NORTHERN REGIONFLATHEAD NATIONAL FORESTBOB MARSHALL WILDERNESS HOUSING DEFERRED MAINTENANCEThis project will repair cabins that provide housing for trail crews, firefighters, and volunteers. Basic repairs include new roofing, refinishing floors and painting. Complex upgrades involve replacing a septic system and fixing water systems.1ST MONTANA$775,000
R1, NORTHERN REGIONFLATHEAD NATIONAL FORESTLINDBERGH LAKE CAMPGROUND DEFERRED MAINTENANCE AND RESOURCE PROTECTIONThis project will repair and upgrade the campground to fit current and future user needs.1ST MONTANA$785,000
R1, NORTHERN REGIONCUSTER GALLATIN NATIONAL FORESTBEARTOOTH BUNKHOUSES HOUSING RENOVATIONThis project will repair and improve the Red Lodge South and North bunkhouses to correct human health and safety and structural integrity concerns.1ST MONTANA$260,000
R1, NORTHERN REGIONKOOTENAI NATIONAL FORESTBOAT RAMP AND DOCK REPAIR AND REPLACEMENTThe project will replace damaged boat docks and repair deteriorating boat launches.1ST MONTANA$1,150,000
R1, NORTHERN REGIONKOOTENAI NATIONAL FORESTPECK GULCH CAMPGROUND TOILET REPLACEMENTThis project will update or replace toilet facilities.1ST MONTANA$180,000
R1, NORTHERN REGIONHELENA-LEWIS AND CLARK NATIONAL FORESTLEWIS AND CLARK INTERPRETIVE CENTER EXHIBIT UPDATEThis project will update Lewis and Clark Interpretive Center exhibits.1ST MONTANA$600,000
R1, NORTHERN REGIONHELENA-LEWIS AND CLARK NATIONAL FORESTLEWIS AND CLARK INTERPRETIVE CENTER DEFERRED MAINTENANCE PHASE 2This project will update lighting, windows, paint, exterior facade, and doors.1ST MONTANA$1,025,000
R1, NORTHERN REGIONHELENA-LEWIS AND CLARK NATIONAL FORESTJUDITH RANGER DISTRICT BUNKHOUSE REPLACEMENTThis project will replace the existing triple-wide bunkhouse with a new stick framed energy efficient and sustainable quarters building.1ST MONTANA$1,060,000
R1, NORTHERN REGIONLOLO NATIONAL FORESTSAINT REGIS WORKCENTER HOUSING WASTEWATER SYSTEMThis project will replace the wastewater system at the Saint Regis work center.1ST MONTANA$515,737
R1, NORTHERN REGIONLOLO NATIONAL FORESTRATTLESNAKE RECREATION AREA AND WILDERNESS TRAILHEAD AND TRAIL MAINTENANCEThis project includes paving the main trailhead parking lot, deferred maintenance on the Sawmill Gulch Road, replacement of trailhead entrance signs and kiosks, and deferred maintenance on wilderness trails.1ST MONTANA$542,761
R1, NORTHERN REGIONLOLO NATIONAL FORESTHISTORIC NINEMILE HOUSING WATER AND WASTEWATER SYSTEM REPLACEMENTThis project will replace the water and wastewater systems at the Historic Ninemile Ranger Station.1ST MONTANA$1,300,000
R1, NORTHERN REGIONLOLO NATIONAL FORESTRECONSTRUCTION OF T-150 MISSOULA AREA MASTER PLAN PHASE I, FORT MISSOULA FACILITIESThis project will eliminate health and safety concerns by reconstructing a building meeting the historic obligations to Fort Missoula. 1ST MONTANA$6,324,263
R1, NORTHERN REGIONNEZ PERCE-CLEARWATER NATIONAL FORESTRURAL AIRSTRIP DEFERRED MAINTENANCE AND HAZARD MITIGATIONThis project mitigates airfield hazards and addresses deferred maintenance on the Forest's seven backcountry airstrips.1ST IDAHO$627,000
R1, NORTHERN REGIONNEZ PERCE-CLEARWATER NATIONAL FORESTPOWELL DUPLEX HOUSING ROOF REPAIRPowell Duplex suffered severe water damage due to roof failure. This project will replace the roof, ceiling, flooring, and carpeting.1ST IDAHO$305,000
R1, NORTHERN REGIONDAKOTA PRAIRIE GRASSLANDSMAAH DAAH HEY TRAIL BRIDGE REPLACEMENTSThis project will construct trail bridges on Maah Daah Hey Trail.NORTH DAKOTA AT LARGE$390,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R2, ROCKY MOUNTAIN REGIONR2, ROCKY MOUNTAIN REGIONMULTI-REGION CONTINENTAL DIVIDE TRAIL DEFERRED TRAIL MAINTENANCEThe Continental Divide National Scenic Trail (CDNST) is one of the world's premiere long-distance trails. This project will address general, non-structural deferred trail maintenance.1ST WYOMING,
2ND COLORADO,
2ND IDAHO,
2ND NEW MEXICO,
3RD COLORADO,
3RD NEW MEXICO,
5TH COLORADO
$4,802,000
R2, ROCKY MOUNTAIN REGIONBIGHORN NATIONAL FORESTGREYBULL WORK CENTER BARRACKS RENOVATIONSThis project will address deferred maintenance at the barracks at Greybull Work Center, which serves as the duty station for the Wyoming Hotshots.WYOMING AT LARGE$236,130
R2, ROCKY MOUNTAIN REGIONBIGHORN NATIONAL FORESTGREYBULL WORK CENTER SITE IMPROVEMENTSThis project will increase employee housing by constructing three additional camper trailer pads with full utility hookups and placing new aggregate throughout the work center parking lot.WYOMING AT LARGE$394,842
R2, ROCKY MOUNTAIN REGIONBIGHORN NATIONAL FORESTGREYBULL WORK CENTER HOTSHOT OFFICE/SHOP RENOVATIONRenovations to the Greybull Work Center office/shop will include a new roof, painting, flooring and bathroom repairs.WYOMING AT LARGE$1,251,481
R2, ROCKY MOUNTAIN REGIONBIGHORN NATIONAL FORESTBURGESS RANGER STATION BATHHOUSE MAINTENANCEProject will replace an aging bathhouse at Burgess Ranger Station and upgrade the recreational vehicle hookups for use by seasonal employees and campground hosts.WYOMING AT LARGE$200,000
R2, ROCKY MOUNTAIN REGIONBIGHORN NATIONAL FORESTSHERIDAN MUNICIPAL WATERSHED ROADS IMPROVEMENTThe project work consists of road surfacing and vegetation removal.WYOMING AT LARGE$2,011,000
R2, ROCKY MOUNTAIN REGIONBLACK HILLS NATIONAL FORESTTINTON ROAD IMPROVEMENTSThis project will improve the road by grading, cleaning culverts, and adding aggregate.SOUTH DAKOTA AT LARGE$500,000
R2, ROCKY MOUNTAIN REGIONBLACK HILLS NATIONAL FORESTLITTLE SPEARFISH WATERSHED TRAIL IMPROVEMENTSThis project will address maintenance and environmental issues on both the Little Spearfish trail and 76 Trail.SOUTH DAKOTA AT LARGE$120,000
R2, ROCKY MOUNTAIN REGIONBLACK HILLS NATIONAL FORESTSTRAWBERRY DAM REHABILITATIONThis project will include updating a fishing pier, dredging the lake, and rehabilitating the outlet works and spillway.SOUTH DAKOTA AT LARGE$700,000
R2, ROCKY MOUNTAIN REGIONGRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTSHORSE RANCH PARK/CLIFF CREEK TRAILHEAD RECONSTRUCTIONThis project will redesign existing parking, camping and stock features will help define parking, reduce overuse impacts and upgrade recreational amenities.3RD COLORADO$316,000
R2, ROCKY MOUNTAIN REGIONGRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTSLIZARDHEAD PASS SAFETY PROJECTThis project will reconstruct the trailhead parking lot to make it safer for winter use.3RD COLORADO$300,000
R2, ROCKY MOUNTAIN REGIONGRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTSWARD LAKE GUARD STATION HOUSES REPAIRSThis project includes building repairs to three of the buildings at the Ward Lake Guard Station including the Dwelling, Administrative Building, and the Bunkhouse.3RD COLORADO$522,000
R2, ROCKY MOUNTAIN REGIONGRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTSWEST MUDDY GUARD STATION MAJOR RENOVATIONThis project will complete a major renovation of the West Muddy Guard Station, including installation of new well and updated sewer system.3RD COLORADO$626,000
R2, ROCKY MOUNTAIN REGIONGRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTSCOLD SPRINGS GUARD STATION REPAIRSThis Project will complete interior and exterior repairs at Cold Springs Guard Station.3RD COLORADO$284,000
R2, ROCKY MOUNTAIN REGIONGRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTSFOREST WIDE KIOSK REPLACEMENTThis project will update public facing information and display trail locations more accurately.3RD COLORADO$288,000
R2, ROCKY MOUNTAIN REGIONMEDICINE BOW-ROUTT NATIONAL FORESTSWYOMING CAMPGROUND DEFERRED MAINTENANCEThis project will resurface and extend parking spurs and redefine living spaces and tent pads.WYOMING AT LARGE$400,000
R2, ROCKY MOUNTAIN REGIONNEBRASKA NATIONAL FORESTBESSEY 4 H RESIDENCEThis project will bring the structure into code compliance to provide housing for temporary/seasonal employees.3RD NEBRASKA$708,000
R2, ROCKY MOUNTAIN REGIONNEBRASKA NATIONAL FORESTCIRCLE ROAD AGGREGATE PLACEMENT AND GRADINGThis project will address road reconditioning and placement of aggregate.3RD NEBRASKA$216,000
R2, ROCKY MOUNTAIN REGIONNEBRASKA NATIONAL FORESTFOREST WIDE TOILET REPLACEMENTThis project will replace existing fiberglass toilet units with concrete toilet facilities.SOUTH DAKOTA AT LARGE, 3RD NEBRASKA$855,000
R2, ROCKY MOUNTAIN REGIONRIO GRANDE NATIONAL FORESTUTE CREEK "BLUE HOLE" TRAIL PROJECTThis project will address destabilization issues on the first 6 miles of Ute Creek Trail to prevent sedimentation into the Rio Grande River Headwaters from connector streams and provide safer access to the public.3RD COLORADO$130,000
R2, ROCKY MOUNTAIN REGIONRIO GRANDE NATIONAL FORESTBRIDGE DEFERRED MAINTENANCE AND REPAIRSThis project will repair and maintain road bridges throughout the forest.3RD COLORADO$120,000
R2, ROCKY MOUNTAIN REGIONRIO GRANDE NATIONAL FORESTSTONE CELLAR GUARD STATION DEFERRED MAINTENANCEThe project will make exterior and interior repairs at Stone Cellar Guard Station.3RD COLORADO$105,000
R2, ROCKY MOUNTAIN REGIONRIO GRANDE NATIONAL FORESTOLD TOILET BUILDING REPLACEMENTSThis project will replace vault toilets.3RD COLORADO$540,000
R2, ROCKY MOUNTAIN REGIONARAPAHO AND ROOSEVELT NATIONAL FORESTSHERMAN GULCH TOILET REPLACEMENTThis project will install a precast concrete vault toilet. The existing toilet has been irreparably damaged.2ND COLORADO$167,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSMONUMENT FIRE CENTER DWELLING DEFERRED MAINTENANCEThe Monument Fire Center includes living and working facilities for the Pike Interagency Hotshot and Monument Helitack crews. This project will address deferred maintenance at the dwelling quarters facility.5TH COLORADO$400,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSLAKE ISABEL REPAVING PHASE TWOThis project will improve the roadway and parking area.3RD COLORADO$1,999,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSSOUTH PARK DISTRICT OFFICE REHAB AND PIKES PEAK RANGER DISTRICT PARKING LOT AND GATE REPLACEMENTThis project will repair the deteriorated parking lot at Pikes Peak Ranger District and rehabilitate the office at South Park Ranger District.5TH COLORADO$500,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSLEADVILLE QUARTERS REHABILITATIONThis project will rehabilitate two dwellings. Both facilities are historically significant heritage buildings and important quarters assets for District staff.3RD COLORADO$1,020,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSLAKE ISABEL ACCESSIBLE TRAIL - PHASE ONEThis project will reconstruct an accessible trail and parking area to meet Forest Service accessibility standards.3RD COLORADO$535,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSSOUTH PARK FAIRPLAY WORK CENTER REHABILITATION AND UTILITY IMPROVEMENTThis project will repair the sewer system, replace trailers, and address deferred maintenance in the bunkhouses and dwelling. 5TH COLORADO$550,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSLEADVILLE CRYSTAL LAKES BARRACKS REHABILITATIONThe Crystal Lakes Barracks is over 40 years old and in need of many repairs and upgrades for the health and safety of the tenants.3RD COLORADO$605,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSLEADVILLE CRYSTAL LAKES DWELLING ONE REHABILITATION (BROWN HOUSE)This facility houses permanent and seasonal Forest Service employees. It needs many repairs and upgrades for the health and safety of the tenants.3RD COLORADO$600,000
R2, ROCKY MOUNTAIN REGIONPIKE AND SAN ISABEL NATIONAL FORESTSLEADVILLE CRYSTAL LAKE WATER TREATMENTThis project will install a surface water treatment facility to comply with State of Colorado drinking water requirements at the work center.3RD COLORADO,
7TH COLORADO
$510,000
R2, ROCKY MOUNTAIN REGIONSAN JUAN NATIONAL FORESTMCPHEE RESERVOIR ROAD RESURFACINGThis project will overlay pavement on existing roads in McPhee Reservoir to the boat launch ramp at the Marina.3RD COLORADO$750,000
R2, ROCKY MOUNTAIN REGIONSAN JUAN NATIONAL FORESTPAGOSA FIRE HERITAGEThis project will renovate the historic Eight Mile fire lookout and communication tower.3RD COLORADO$100,000
R2, ROCKY MOUNTAIN REGIONSAN JUAN NATIONAL FORESTMCPHEE BUILDINGS AND RECREATION ACCESS DEFERRED MAINTENANCEThis project will renovate buildings and features supporting developed recreation, trails, water quality, partnerships and operations near the McPhee Reservoir.3RD COLORADO$370,000
R2, ROCKY MOUNTAIN REGIONSAN JUAN NATIONAL FORESTBIG AL TRAILThis project will bring the trail up to accessible trail standards.3RD COLORADO$140,000
R2, ROCKY MOUNTAIN REGIONSAN JUAN NATIONAL FORESTPROVANCHER RANCH RESTORATIONThis project will stabilize and repair a 1900 heritage cabin and barn.3RD COLORADO$185,000
R2, ROCKY MOUNTAIN REGIONSHOSHONE NATIONAL FORESTFOREST WIDE TOILET REPLACEMENTThis project will replace toilets with new concrete building vault toilets.WYOMING AT LARGE$360,000
R2, ROCKY MOUNTAIN REGIONSHOSHONE NATIONAL FORESTFOREST WIDE TRAILS DEFERRED MAINTENANCE TWOThis project will rebuild and relocate unserviceable trail sections to sustainable locations and address major trail issues such as manifesting chronic erosion, rock slabs, rockslides, realignment, wetland crossings, and dangerous trail bridge.WYOMING AT LARGE$250,000
R2, ROCKY MOUNTAIN REGIONSHOSHONE NATIONAL FORESTSOUTH ZONE FIRST FOREST/FACILITY MAINTENANCEThis project will preserve historically significant structures in four locations by reducing deferred maintenance.WYOMING AT LARGE$100,000
R2, ROCKY MOUNTAIN REGIONSHOSHONE NATIONAL FORESTFOREST WIDE TRAILS DEFERRED MAINTENANCEThis project will rebuild and relocate unserviceable trail sections to sustainable locations to avoid chronic river washouts, address poor trail tread contributing to manifesting erosional issues, and replace hazardous bridges and puncheon.WYOMING AT LARGE$207,000
R2, ROCKY MOUNTAIN REGIONWHITE RIVER NATIONAL FORESTCHAPMAN DAM AND CAMPGROUND IMPROVEMENTSThis project includes repairs to Chapman Dam and partial replacement of the water system at Chapman Campground.3RD COLORADO$1,100,000
R2, ROCKY MOUNTAIN REGIONWHITE RIVER NATIONAL FORESTBLANCO RANGER HOUSE REMODELThis project will reconstruct the entire interior of the Blanco Ranger house.3RD COLORADO$515,000
R2, ROCKY MOUNTAIN REGIONWHITE RIVER NATIONAL FORESTFOREST-WIDE PARTNERSHIP TRAIL PROJECT THREEThis project will complete deferred maintenance on trails across the White River National Forest's expansive and heavily used trail system.2ND COLORADO, 3RD COLORADO$1,375,056

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R3, SOUTHWESTERN REGIONCARSON NATIONAL FORESTCANJILON LAKES CAMPGROUND ROAD - PAVEMENT REPLACEMENTThis project addresses the maintenance needs on Alkali Spring Road which accesses the Canjilon Lakes area.3RD NEW MEXICO$4,100,000
R3, SOUTHWESTERN REGIONCARSON NATIONAL FORESTWATER SYSTEM IMPROVEMENTSThis project will replace the existing exterior underground distribution drinking water system.3RD NEW MEXICO$500,000
R3, SOUTHWESTERN REGIONCARSON NATIONAL FORESTCANJILON LAKES CAMPGROUND IMPROVEMENTThis project will address deferred maintenance at Canjilon Lakes Campground.3RD NEW MEXICO$575,000
R3, SOUTHWESTERN REGIONCOCONINO NATIONAL FORESTCAVE SPRINGS CAMPGROUND RECONSTRUCTION PROJECTThe campground requires improvements to meet current recreational camper sizes and requirements to function properly including replacing vault toilets and changing direction of one camping loop.1ST ARIZONA,
2ND ARIZONA
$1,900,000
R3, SOUTHWESTERN REGIONCOCONINO NATIONAL FORESTNFSR 516(AZ SNOWBOWL ROAD) PAVEMENT REHABILITATIONThis project includes asphalt surfacing, road reconditioning, drainage, and safety improvements over the entire Snowbowl Road.1ST ARIZONA$14,600,000
R3, SOUTHWESTERN REGIONCORONADO NATIONAL FORESTSANTA RITA WELLSThis project will drill and develop one well each at Florida Work Center, Bog Spring Campground, and Kent Springs Cabin to replace spring sources in wilderness.2ND ARIZONA,
6TH ARIZONA,
7TH ARIZONA,
8TH ARIZONA
$980,000
R3, SOUTHWESTERN REGIONCORONADO NATIONAL FORESTSABINO CANYON PARKING ENHANCEMENTThis project will improve the Sabino Canyon Recreation Area parking areas.6TH ARIZONA$125,000
R3, SOUTHWESTERN REGIONKAIBAB NATIONAL FORESTOAK HILL DECOMMISSION AND KEYHOLE SINK TRAILHEAD RELOCATIONThis project will decommission Oak Hill parking lot and snow play site and construct a new trailhead for Keyhole Sink.1ST ARIZONA,
2ND ARIZONA
$110,000
R3, SOUTHWESTERN REGIONKAIBAB NATIONAL FORESTNORTH KAIBAB TRAILER PADS/HOUSING UNITThis project will upgrade existing recreation vehicle pads at work center sites.1ST ARIZONA$325,000
R3, SOUTHWESTERN REGIONKAIBAB NATIONAL FORESTTUSAYAN TRAILER PAD/ HOUSING UNITThis project will upgrade existing recreational vehicle pads.1ST ARIZONA$115,000
R3, SOUTHWESTERN REGIONSANTA FE NATIONAL FORESTDISTRICT OFFICE & WAREHOUSE ROOF REPLACEMENTSThis project will replace the metal roofs on the Coyote Ranger District Office and Warehouse.3RD NEW MEXICO$200,000
R3, SOUTHWESTERN REGIONSANTA FE NATIONAL FORESTCABIN RENTAL READINESS PROJECTSThis project address deferred maintenance to maintain historic character and convert to rental cabins.3RD NEW MEXICO$150,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R4, INTERMOUNTAIN REGIONASHLEY NATIONAL FORESTFLAMING GORGE NATIONAL RECREATION AREA WATER SYSTEMS BUCKBOARD AND HIDEOUTThe project will rehabilitate and upgrade the two water system treatment facilities, distribution lines, storage tanks, and other necessary items to reduce maintenance and operations needs and ensure potable water.WYOMING AT LARGE,
1ST UTAH
$3,774,000
R4, INTERMOUNTAIN REGIONASHLEY NATIONAL FORESTRED CANYON CORRIDOR PAVINGThis project would repave roads, parking areas, and accessible paved trails at the Red Canyon Visitor Center overlook.1ST UTAH$3,550,000
R4, INTERMOUNTAIN REGIONBRIDGER-TETON NATIONAL FORESTGREYS RIVER CORRIDOR PHASE 3This project will conduct aggregate resurfacing.WYOMING AT LARGE$1,000,000
R4, INTERMOUNTAIN REGIONDIXIE NATIONAL FORESTFORESTWIDE TRAIL MAINTENANCEThis project will improve hiker, mountain-biker and equestrian experiences by mitigating years of deferred trail maintenance.2ND UTAH$730,000
R4, INTERMOUNTAIN REGIONDIXIE NATIONAL FORESTPINE VALLEY DAM SPILLWAY CAPACITY AND LIQUIFACTION MITIGATIONThe Pine Valley dam crest will be raised. The low water outlet will be replaced, the upstream and downstream slopes will be stabilized, and the upstream slope armoring will be replaced.2ND UTAH$3,950,000
R4, INTERMOUNTAIN REGIONMANTI-LA SAL NATIONAL FORESTSOUTH ZONE CAMPGROUND FENCESThis project will repair campground fencing. The forest around the campgrounds is grazed by livestock.3RD COLORADO,
3RD UTAH
$690,000
R4, INTERMOUNTAIN REGIONMANTI-LA SAL NATIONAL FORESTPHASE 2 & 3 PICNIC TABLE AND FIRE RINGSThis project will replace picnic tables and fire rings in campgrounds.3RD UTAH,
4TH UTAH
$550,000
R4, INTERMOUNTAIN REGIONMANTI-LA SAL NATIONAL FORESTJOES VALLEY CAMPGROUND RESTORATIONThe Joes Valley Campground project seeks to address deferred maintenance of the interior campground roads, spurs, and parking areas, while also providing an additional opportunity for group camping.2ND UTAH,
3RD UTAH
$1,139,900
R4, INTERMOUNTAIN REGIONMANTI-LA SAL NATIONAL FORESTBAKER SITE HOUSING DEFERRED MAINTENANCEThis project will remodel the interior and exterior of the dwelling and replace the concrete pad in the garage.2ND UTAH$490,000
R4, INTERMOUNTAIN REGIONSALMON-CHALLIS NATIONAL FORESTDAGGER FALLS TRAIL BRIDGE CRITICAL REPAIRSThis project will rehabilitate the Dagger Falls Trail Bridge.1ST IDAHO,
2ND IDAHO
$50,000
R4, INTERMOUNTAIN REGIONSAWTOOTH NATIONAL FORESTBIG SMOKY ADMINISTRATION SITE HOUSING DEFERRED MAINTENANCEThe project will repair the sewer line, grind asphalt pavement, and install membranes for sewer cell lagoons.1ST IDAHO,
2ND IDAHO
$730,000
R4, INTERMOUNTAIN REGIONCARIBOU-TARGHEE NATIONAL FORESTISLAND PARK ADMIN SITE HOUSING SEWER SYSTEM REPLACEMENTThis project will replace an aging wastewater system that is failing, creating health hazards from wastewater backing up into employee residences.2ND IDAHO$780,000
R4, INTERMOUNTAIN REGIONCARIBOU-TARGHEE NATIONAL FORESTISLAND PARK ADMIN SITE HOUSING ROOF REPLACEMENTSThis project will replace aging roofs at housing units on the compound.2ND IDAHO$525,000
R4, INTERMOUNTAIN REGIONCARIBOU-TARGHEE NATIONAL FORESTCARIBOU-TARGHEE TRAIL DEFERRED MAINTENANCEThe project will reconstruct, revitalize, and restore recreation sites and trails.WYOMING AT LARGE,
2ND IDAHO
$650,000
R4, INTERMOUNTAIN REGIONCARIBOU-TARGHEE NATIONAL FORESTMESA FALLS ROAD MAINTENANCE PROJECTThis project will repair Mesa Falls Road, which accesses the Mesa Falls Visitors Site.2ND IDAHO$751,000
R4, INTERMOUNTAIN REGIONCARIBOU-TARGHEE NATIONAL FORESTMESA FALLS RECREATION AREA DEFERRED MAINTENANCEThis project will replace the roof at Big Falls Inn and improve boardwalks, pedestrian infrastructure and parking areas.2ND IDAHO$2,404,000
R4, INTERMOUNTAIN REGIONHUMBOLDT-TOIYABE NATIONAL FORESTHOUSING DEFERRED MAINTENANCEThis project includes finishing basements, remodeling bathrooms, replacing waterlines, and replacing furnaces.25TH CALIFORNIA,
2ND NEVADA,
3RD NEVADA,
4TH NEVADA
$758,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R5, PACIFIC SOUTHWEST REGIONANGELES NATIONAL FORESTCHILAO CAMPGROUND COMPLEX - WATER SYSTEM REHABILITATIONThis project will install new pipelines and valves and rehabilitate the water tanks.26TH CALIFORNIA,
27TH CALIFORNIA,
28TH CALIFORNIA,
33RD CALIFORNIA
$2,700,000
R5, PACIFIC SOUTHWEST REGIONANGELES NATIONAL FORESTCHANTRY FLATS PICNIC AREAThis project will demolish the barracks and construct a new shuttle stop.22ND CALIFORNIA,
26TH CALIFORNIA,
27TH CALIFORNIA
$485,000
R5, PACIFIC SOUTHWEST REGIONANGELES NATIONAL FORESTSAN GABRIEL MONUMENT BARRACKS RECONSTRUCTIONThe project will repair barracks and update existing water and sanitation systems.26TH CALIFORNIA,
27TH CALIFORNIA,
28TH CALIFORNIA
$2,500,000
R5, PACIFIC SOUTHWEST REGIONCLEVELAND NATIONAL FORESTRENOVATE FALCON GROUP CAMPGROUND AND TRAILSThis project renovates a very popular group campground, including replacement of deteriorated amenities and access improvements.40TH CALIFORNIA,
44TH CALIFORNIA,
45TH CALIFORNIA
$1,110,000
R5, PACIFIC SOUTHWEST REGIONINYO NATIONAL FORESTWHITNEY ZONE TRAILS STORM DAMAGE REPAIRThe project will improve storm resiliency and public access. Work includes short re-alignments, structure construction, and re-establishing the corridor and tread.25TH CALIFORNIA$240,000
R5, PACIFIC SOUTHWEST REGIONKLAMATH NATIONAL FORESTRUSSIAN WILDERNESS PACIFIC CREST TRAIL AND FEEDER TRAILS DEFERRED MAINTENANCEThis project will address deferred maintenance and improve visitor safety by logging-out fallen trees, clearing brush from trail, repairing trail tread and repairing drainage structures.1ST CALIFORNIA,
2ND CALIFORNIA
$695,000
R5, PACIFIC SOUTHWEST REGIONLOS PADRES NATIONAL FORESTFACILITIES REPAIRSThis project will address deferred maintenance of facilities that support temporary quarters, fire, and administration program areas.17TH CALIFORNIA,
22ND CALIFORNIA,
23RD CALIFORNIA,
24TH CALIFORNIA
$1,385,000
R5, PACIFIC SOUTHWEST REGIONMENDOCINO NATIONAL FORESTFOUTS SPRINGS CRITICAL WATER SYSTEM REPAIRSThis project will replace filters, re-configure piping between components and replace the pressure tank.1ST CALIFORNIA,
3RD CALIFORNIA
$120,000
R5, PACIFIC SOUTHWEST REGIONMODOC NATIONAL FORESTFORESTWIDE RECREATION SITE MAINTENANCEThis project will repair campground and trailhead loops as well as replace kiosks and signage at sites.1ST CALIFORNIA,
2ND CALIFORNIA,
4TH CALIFORNIA
$800,000
R5, PACIFIC SOUTHWEST REGIONSIX RIVERS NATIONAL FORESTBUCK MOUNTAIN ROAD RESTORATIONThis project consists of replacing failed culverts on Buck Mountain Road 1N10, near the crossing with Kuntz Creek, as well as grinding of failed pavement to create aggregate surfacing change within Forest Road 1N30.01 - FIRST DISTRICT,
1ST CALIFORNIA
$1,000,000
R5, PACIFIC SOUTHWEST REGIONSIX RIVERS NATIONAL FORESTTRAIL MAINTENANCE MAD RIVER DISTRICTThis project includes brushing, removal of logs, and tread work on trails.1ST CALIFORNIA,
2ND CALIFORNIA
$200,000
R5, PACIFIC SOUTHWEST REGIONSIX RIVERS NATIONAL FORESTTRAIL MAINTENANCE GASQUET NATIONAL RECREATION AREAThis project includes brushing, removal of logs, and tread work on trails.1ST CALIFORNIA$211,000
R5, PACIFIC SOUTHWEST REGIONPLUMAS NATIONAL FORESTUPPER GOLDEN TROUT BRIDGE REPLACEMENTThe Upper Golden Trout Bridge was destroyed by the North Complex Fire. This project will rebuild the bridge.4TH CALIFORNIA$2,396,444
R5, PACIFIC SOUTHWEST REGIONPLUMAS NATIONAL FORESTBECKWOURTH DISTRICT OFFICE WATER SYSTEM REPLACEMENTThis project will replace the water distribution lines and provide upgrades to the water system.2ND CALIFORNIA,
4TH CALIFORNIA
$605,000
R5, PACIFIC SOUTHWEST REGIONSAN BERNARDINO NATIONAL FORESTAPPLEWHITE CAMPGROUND AND PICNIC AREA ACCESSIBILITY IMPROVEMENTSThis project includes pavement rehabilitation, replacement of one campground restroom facility, installation of two pavilion structures, and improved connectivity between sites with an advanced warning crosswalk.26TH CALIFORNIA,
28TH CALIFORNIA,
35TH CALIFORNIA
$3,350,000
R5, PACIFIC SOUTHWEST REGIONSAN BERNARDINO NATIONAL FORESTGROUT BAY & GRAYS PEAK DAY USE AREA RECONSTRUCTIONThis project will replace restrooms, rehabilitate paved roads and parking lots, and rehabilitate the water distribution system.23RD CALIFORNIA,
35TH CALIFORNIA,
41ST CALIFORNIA
$1,500,000
R5, PACIFIC SOUTHWEST REGIONSHASTA TRINITY NATIONAL FORESTHISTORIC RECREATION CABIN AND BARN ROOF REPLACEMENTThis project will replace the deteriorated cedar shake roofs at historic recreation rental cabins with a fire-resistant roof. This project will also replace the metal roof at the historic Animal Pack Stock barn.1ST CALIFORNIA,
2ND CALIFORNIA
$335,000
R5, PACIFIC SOUTHWEST REGIONSHASTA TRINITY NATIONAL FORESTASH CREEK GUARD STATION MULTI YEARThis project will replace the engine garage and remove warehouses and the electrical building.2ND CALIFORNIA$4,000,000
R5, PACIFIC SOUTHWEST REGIONSIERRA NATIONAL FORESTADMINISTRATIVE AND RECREATION FACILITIES REHABILITATIONThe project will rehabilitate facilities that support the stock and wilderness program.4TH CALIFORNIA$6,767,000
R5, PACIFIC SOUTHWEST REGIONSTANISLAUS NATIONAL FORESTRIVERSIDE DAY USE AREA REHABILITATIONThis project will rehabilitate the Riverside Day Use and Picnic Area.4TH CALIFORNIA,
5TH CALIFORNIA
$120,000
R5, PACIFIC SOUTHWEST REGIONSTANISLAUS NATIONAL FORESTRIM OF THE WORLD TOILET REPLACEMENTThis project will replace the heavily used single vault prefabricated toilet located at the Rim of the World observation site with a new double vault facility.5TH CALIFORNIA$120,000
R5, PACIFIC SOUTHWEST REGIONLAKE TAHOE BASIN MGT UNITNEVADA BEACH DAY USE AND CAMPGROUND WATER SYSTEM UPGRADESThis project involves the replacement of the water mains at the Nevada Beach Day Use Area, which services the existing six bathrooms adjacent to the campground, and services housing barracks.2ND NEVADA$450,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R6, PACIFIC NORTHWEST REGIONFREMONT-WINEMA NATIONAL FORESTSCOTTONWOOD CAMPGROUND TRAIL BRIDGE REPLACEMENTThis project will replace the deteriorating bridge with a new premanufactured weathering steel truss bridge.2ND OREGON$186,000
R6, PACIFIC NORTHWEST REGIONGIFFORD PINCHOT NATIONAL FORESTNORTH FORK GUARD STATION RESTORATIONNorth Fork Guard Station is a historic structure that needs major renovation and repair to make it a functioning building again.3RD WASHINGTON$200,000
R6, PACIFIC NORTHWEST REGIONMT BAKER-SNOQUALMIE NATIONAL FORESTFOREST RESIDENCES FLOORING BUNDLEThis project will replace flooring in residences.2ND WASHINGTON$331,000
R6, PACIFIC NORTHWEST REGIONMT HOOD NATIONAL FORESTLAKE BRANCH BRIDGE REPLACEMENTThis project replaces Lake Branch Bridge, which failed a fracture critical test. This bridge is currently shut down but is normally the secondary emergency egress from Lost Lake, a major recreation site.2ND OREGON$2,740,000
R6, PACIFIC NORTHWEST REGIONSIUSLAW NATIONAL FORESTQUARTERS AND FACILITIES DEFERRED MAINTENANCE REDUCTIONThis project involves maintenance and restoration of quarters and other administrative and recreation buildings.1ST OREGON,
3RD OREGON,
4TH OREGON,
5TH OREGON
$2,165,000
R6, PACIFIC NORTHWEST REGIONWALLOWA WHITMAN NATIONAL FORESTNORTH ZONE HOUSING REPAIRS AND DMThis project will remodel and recondition existing living quarters at the Sled Springs Work Center and the Wallowa Lake House.2ND OREGON$500,000
R6, PACIFIC NORTHWEST REGIONWALLOWA WHITMAN NATIONAL FORESTWALLOWA MOUNTAIN LOOP ROAD SCENIC BYWAY PAVEMENT AND IMPROVEMENTSThis project will reconstruct the first section of the 39 Road from the forest boundary to Salt Creek Summit.2ND OREGON$6,100,000
R6, PACIFIC NORTHWEST REGIONOKANOGAN-WENATCHEE NATIONAL FORESTSFIELDS POINT PUBLIC FERRY DOCK REPAIRSThe fixed pier, floating dock, and pedestrian ramp are at the end of service life and require replacement.8TH WASHINGTON$2,610,000
R6, PACIFIC NORTHWEST REGIONOKANOGAN-WENATCHEE NATIONAL FORESTSCLE ELUM BUNKHOUSE RENOVATIONThis project will renovate Cle Elum Administrative Site bunkhouses, including roof and window replacement, new flooring and kitchen counters, and bathroom remodel.4TH WASHINGTON$550,000
R6, PACIFIC NORTHWEST REGIONCOLVILLE NATIONAL FORESTFOREST WIDE DISTRICT HOUSING IMPROVEMENTSThis project will improve employee housing across the forest by remodeling existing bunkhouses and houses to accommodate additional persons as well as to improve amenities and accessibility.5TH WASHINGTON$270,000
R6, PACIFIC NORTHWEST REGIONCOLVILLE NATIONAL FORESTTONASKET ROAD REHABILITATIONThis project will rehabilitate asphalt roads.5TH WASHINGTON$5,850,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R8, SOUTHERN REGIONDANIEL BOONE NATIONAL FORESTGREAT MEADOWS WATER SYSTEM REPLACEMENTThis project will update a well water system installed in the 1970s to a city water system.5TH KENTUCKY$325,000
R8, SOUTHERN REGIONCHATTAHOOCHEE-OCONEE NATIONAL FORESTCHATTOOGA RIVER DISTRICT-WIDE CHEMICAL TOILET REPLACEMENTThe chemical toilets are irreparable and will be replaced.9TH GEORGIA$720,000
R8, SOUTHERN REGIONCHATTAHOOCHEE-OCONEE NATIONAL FORESTLAKE CONASAUGA RECREATION AREA REHABILITATIONThis project includes maintenance and rehabilitation of existing assets associated with the Lake Conasauga Recreation Area and road access.10TH GEORGIA,
14TH GEORGIA
$2,665,000
R8, SOUTHERN REGIONNATIONAL FORESTS IN MISSISSIPPIBIENVILLE ADMINISTRATIVE SITE REPLACEMENTThis project will decommission the current district office and perform a general renovation on the main work center building and add a new Ranger office to house both district office and work center personnel at the same location.3RD MISSISSIPPI$11,000,000
R8, SOUTHERN REGIONNATIONAL FORESTS IN MISSISSIPPIDAVIS LAKE RECREATION AREA-REPLACE WATER LINESThis project includes maintenance of the existing water system that supplies water to the Davis Lake Recreation Area and the unit Work Center.1ST MISSISSIPPI$161,000
R8, SOUTHERN REGIONNATIONAL FORESTS IN MISSISSIPPICHEWALLA RECREATION AREA BATHHOUSE REPLACEMENTThis project will replace an existing, damaged bathhouse with a four-unit waterless vault toilet.1ST MISSISSIPPI$307,000
R8, SOUTHERN REGIONNATIONAL FORESTS IN MISSISSIPPITURKEY FORK RECREATION AREA PAVING ACCESS ROAD TO DAY-USE AREAThis project will resurface the access road to the day-use area at Turkey Fork Recreation Area.4TH MISSISSIPPI$140,000
R8, SOUTHERN REGIONGEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTSGRINDSTONE RECREATION AREA WASTEWATER TREATMENT PLANT REPLACEMENTThis project will replace the non-operational wastewater treatment and associated collection systems at the Mount Rogers National Recreation Area's Grindstone Recreation Area with on-site treatment.6TH VIRGINIA,
9TH VIRGINIA
$4,600,000
R8, SOUTHERN REGIONOZARK-ST FRANCIS NATIONAL FORESTCOVE LAKE DAM TOWER & SLIPLININGThis project will repair the concrete gate tower structure and concrete outlet conduit.4TH ARKANSAS$1,910,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R9, EASTERN REGIONCHIPPEWA NATIONAL FORESTBOAT ACCESS REPAIRThis project includes upgrading docks, stabilizing boat launch areas with new concrete pads and armoring areas within the access to eliminate erosion.8TH MINNESOTA$315,000
R9, EASTERN REGIONHURON MANISTEE NATIONAL FORESTHURON_MANISTEE-CONE SHED #2This project will repair housing for seasonal staff, partners and volunteers in the historic cone shed building.2ND MICHIGAN$650,000
R9, EASTERN REGIONMARK TWAIN NATIONAL FORESTZONE 3 CAMP SITE AMENITY FEATURE REPLACEMENTThis project will replace campsite amenities at multiple campgrounds.3RD MISSOURI,
7TH MISSOURI,
8TH MISSOURI
$218,000
R9, EASTERN REGIONOTTAWA NATIONAL FORESTHUNTER WALKING TRAIL AND TRAILHEAD REHABThis project will rehabilitate multiple trail complexes and parking areas, kiosks, and signs.1ST MICHIGAN$360,000
R9, EASTERN REGIONSHAWNEE NATIONAL FORESTFORESTWIDE TOILET REPLACEMENTSThis project will replace aging toilets across the forest.12TH ILLINOIS,
15TH ILLINOIS
$295,000
R9, EASTERN REGIONSUPERIOR NATIONAL FORESTFR152 S. BRULE RIVER BRIDGE REPLACEMENTThis project will replace the road bridge over the South Brule River. The current bridge had a damaged superstructure and is load rated.8TH MINNESOTA$1,520,000
R9, EASTERN REGIONSUPERIOR NATIONAL FORESTSEAGULL GUARD STATION FIRE QUARTERS REPLACEMENT -DM/COMPLIANCEThe project will replace two bunkhouse cabins with a single dorm-type structure that would meet accessibility and sustainability requirements at Seagull Guard Station.8TH MINNESOTA$1,545,000
R9, EASTERN REGIONHIAWATHA NATIONAL FORESTMONOCLE LAKE RECREATION ACCESSThis project will repave Monocle Lake Campground.1ST MICHIGAN$602,000
R9, EASTERN REGIONHIAWATHA NATIONAL FORESTBAY FURNACE CG RECREATION ACCESSThis project will repave Bay Furnace Campground.1ST MICHIGAN$778,450
R9, EASTERN REGIONHOOSIER NATIONAL FORESTTIPSAW AND BUZZARD ROOST RECREATION AREAS REHABILITATIONThis project will reconstruct Tipsaw Main Road and Buzzard Roost Road. Additionally, this project will rehabilitate the boat ramp, parking lot, at other features in Tipsaw Lake Recreation Area.8TH INDIANA,
9TH INDIANA
$932,000
R9, EASTERN REGIONCHEQUAMEGON-NICOLET NATIONAL FORESTCHIPPEWA CAMPGROUND SHOWER HOUSE RECONSTRUCTIONThis project will rehabilitate shower houses, one fish cleaning building, and associated site features at the Chippewa Campground.7TH WISCONSIN$1,230,000
R9, EASTERN REGIONWAYNE NATIONAL FORESTHANGING ROCK OHV TRAIL BRIDGE REPLACEMENT AND TRAIL REROUTEUsers are riding through the stream rather than using the existing bridge which is too narrow for current use. This project will replace the trail bridge and reroute the trail.6TH OHIO$395,000
R9, EASTERN REGIONWAYNE NATIONAL FORESTROCK HOUSE TRAIL IMPROVEMENTThis project will repave the trail to comply with Forest Service accessibility standards.6TH OHIO$313,000
R9, EASTERN REGIONALLEGHENY NATIONAL FORESTFR 135 BIG MILL CREEK BRIDGE REPLACEMENTProject will replace Big Mill Creek Bridge.15TH PENNSYLVANIA,
5TH PENNSYLVANIA
$863,000
R9, EASTERN REGIONALLEGHENY NATIONAL FORESTTWIN LAKES CCC_ERA PAVILION RESTORATIONThis project will complete critical repairs at a historic picnic pavilion at Twin Lakes Recreation Area.15TH PENNSYLVANIA$211,000
R9, EASTERN REGIONGREEN MOUNTAIN AND FINGER LAKES NATIONAL FORESTSGLASTENBURY AND STRATTON OBSERVATION TOWER REPAIRSThis project will complete structural repairs to the Glastenbury and Stratton Mountain observation towers to address public safety concerns.VERMONT AT LARGE$662,000
R9, EASTERN REGIONGREEN MOUNTAIN AND FINGER LAKES NATIONAL FORESTSGROUT POND CAMPGROUND IMPROVEMENT AND ACCESSIBLE UPGRADEThis project will construct additional sites, complete accessible upgrades to trails, access points and boat launches, stabilize eroding soils, and increase parking capacity and waste facilities.VERMONT AT LARGE$662,000
R9, EASTERN REGIONMONONGAHELA NATIONAL FORESTLAKE SHERWOOD DAM REPAIRSThis project will determine the structural integrity of the dam, propose repairs such as replacing the water control valve system, and armor emergency overflow to protect the dam and downstream private property.1ST WEST VIRGINIA$2,000,000
R9, EASTERN REGIONMONONGAHELA NATIONAL FORESTROHRBAUGH CABIN RESTORATIONThis project will rehabilitate the historic Rohrbaugh Cabin to convert the asset into a recreation rental.1ST WEST VIRGINIA$782,000
R9, EASTERN REGIONWHITE MOUNTAIN NATIONAL FORESTCORRIDOR 11 ANDRO SNOWMOBILE TRAIL MAINTENANCE/REROUTEThis project will decommission four miles of the existing trail and will relocate this section to a more sustainable location.2ND NEW HAMPSHIRE$730,000

RegionForest or StationProject NameSummaryCongressional
District
2025
Funding
R10, ALASKA REGIONCHUGACH NATIONAL FORESTCRESCENT CREEK BRIDGEThis project will replace a bridge that was damaged in a 2018 landslide.ALASKA AT LARGE$298,000
R10, ALASKA REGIONCHUGACH NATIONAL FORESTRUSSIAN RIVER CAMPGROUND RECONSTRUCTION - PHASE THREEThis project will repair the boardwalk and replace the wastewater system.ALASKA AT LARGE$1,606,000
R10, ALASKA REGIONCHUGACH NATIONAL FORESTCROW CREEK ROAD SURFACE REPAIRThis project will complete surface and subsurface repairs to bring the road to code and improve user safety.ALASKA AT LARGE$600,000
R10, ALASKA REGIONCHUGACH NATIONAL FORESTQUARTZ CREEK CAMPGROUND BOARDWALK REPLACEMENTThis project will replace boardwalk in Quartz Creek Campground.ALASKA AT LARGE$1,614,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTBEAR PAW TRAIL BRIDGE REPLACEMENTThis project will remove the existing log stringer bridge and construct a new bridge.ALASKA AT LARGE$265,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTWINSTANLEY TRAIL BRIDGE REPLACEMENTThis project will re-establish access to Winstanley Lake. It will replace the Winstanley Lake Trail bridge.ALASKA AT LARGE$300,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTNORTHERN FOREST QUARTERS REHABILITATIONThis project will replace components that have reached the end of their usable life in quarters facilities.ALASKA AT LARGE$1,870,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTSTARRIGAVAN VALLEY BRIDGES & TRAIL EXTENSIONThis project will replace two off-highway vehicle bridges and build an off-highway vehicle trail extension to connect to the existing trail system.ALASKA AT LARGE$670,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTJUNEAU COMPOUND HEATING, VENTILATION, AIR CONDITIONING AND ENVELOPE IMPROVEMENTSThis project will improve heating system reliability and efficiency, provide redundant heating sources, reduce condensation on roof, and address ice-dams at various administrative facilities.ALASKA AT LARGE$2,000,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTKETCHIKAN BUNKHOUSE REHABILITATION AND HEATING SYSTEM REPLACEMENTThis project will replace components that have reached the end of their usable life at the Ketchikan Bunkhouse.ALASKA AT LARGE$1,040,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTLOWER SUNTAHEEN TRAIL VIEWING PLATFORM REPLACEMENTThis project will replace the viewing platform and other wood features, including wood steps and railing leading from the platform to the beach access trail.ALASKA AT LARGE$172,000
R10, ALASKA REGIONTONGASS NATIONAL FORESTJUNEAU RECREATION SITE REPAIRSThis project will replace toilet and signboard roofs, picnic tables, and benches at recreation areas.ALASKA AT LARGE$150,000