Great American Outdoors Act – Legacy Restoration Fund, Fiscal Year 2025 Deferred Maintenance Projects
All Regions, National Forests, & Research Stations
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| 11, FOREST PRODUCTS LABORATORY | FOREST PRODUCTS LABORATORY | FOREST PRODUCTS LABORATORY WELCOME CENTER | This project will restore the Forest Products Laboratory main lobby to reflect the original architectural style. | 2ND WISCONSIN | $1,120,000 |
| 12, INTERNATIONAL INSTITUTE OF TROPICAL FORESTRY | INTERNATIONAL INSTITUTE OF TROPICAL FORESTRY | INTERNATIONAL INSTITUTE OF TROPICAL FORESTRY ROOF REPLACEMENTS | This project will replace multiple roofs at the International Institute of Tropical Forestry Headquarters complex. | 98TH PUERTO RICO | $1,100,000 |
| 22, ROCKY MOUNTAIN RESEARCH STATION | ROCKY MOUNTAIN RESEARCH STATION | MISSOULA FIRE LAB COMBUSTION LABORATORY ELEVATOR REPLACEMENT | This project will replace a specialized elevator within the Missoula Fire Lab's combustion laboratory. | 1ST MONTANA | $1,286,000 |
| 22, ROCKY MOUNTAIN RESEARCH STATION | ROCKY MOUNTAIN RESEARCH STATION | PRIEST RIVER EXPERIMENTAL FOREST QUARTERS RENOVATIONS | This project will replace or upgrade finishes, mechanical systems, electrical systems, and parking areas. | 1ST IDAHO | $1,435,000 |
| 22, ROCKY MOUNTAIN RESEARCH STATION | ROCKY MOUNTAIN RESEARCH STATION | SOUTHWEST FORESTRY SCIENCES LABORATORY MECHANCIAL SYSTEM IMPROVEMENTS | This project will provide reliable systems that will improve the operation and function of the building for improved cost efficiency. | 1ST ARIZONA | $1,101,000 |
| 22, ROCKY MOUNTAIN RESEARCH STATION | ROCKY MOUNTAIN RESEARCH STATION | DESERT EXPERIMENTAL RANGE HOUSING IMPROVEMENTS | This project involves the renovation of housing facilities at the Desert Experimental Range and restoration of key site utilities. | 2ND UTAH, 3RD UTAH | $580,000 |
| 24, NORTHERN RESEARCH STATION | NORTHERN RESEARCH STATION | RHINELANDER LABORATORY MECHANICAL SYSTEM REPLACEMENT | This project replaces the existing mechanical systems at the Rhinelander Forestry Sciences Laboratory with new energy efficient systems. | 7TH WISCONSIN | $1,110,000 |
| 24, NORTHERN RESEARCH STATION | NORTHERN RESEARCH STATION | MORGANTOWN LABORATORY ROOF REPLACEMENT | This project will replace the main building’s roof. | 1ST WEST VIRGINIA, 2ND WEST VIRGINIA | $670,000 |
| 24, NORTHERN RESEARCH STATION | NORTHERN RESEARCH STATION | BARTLETT EXPERIMENTAL FOREST HOUSING RESTROOM REMODEL | This project will remodel the restroom facilities at the Barlett Experimental Forest housing. | 1ST NEW HAMPSHIRE, 2ND NEW HAMPSHIRE | $600,000 |
| 24, NORTHERN RESEARCH STATION | NORTHERN RESEARCH STATION | HOUGHTON FORESTRY SCIENCES LABORATORY MECHANICAL SYSTEM UPGRADES | This project will improve the mechanical systems at the Houghton Forestry Sciences Laboratory. | 1ST MICHIGAN | $454,000 |
| 26, PACIFIC NORTHWEST RESEARCH STATION | PACIFIC NORTHWEST RESEARCH STATION | LA GRANDE LABORATORY ACCESSIBILITY RENOVATION | This project will renovate the La Grande Forestry Sciences Laboratory. | 2ND OREGON | $690,000 |
| 27, PACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATION | PACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATION | REDWOOD SCIENCES LABORATORY ROOF REPLACEMENT | Project will replace the roof on the Redwood Sciences Laboratory. | 1ST CALIFORNIA | $720,000 |
| 27, PACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATION | PACIFIC SOUTHWEST FOREST AND RANGE EXPERIMENT STATION | PLACERVILLE STAFF HOUSE RENOVATION | This project will renovate the primary housing facility at the Placerville site. | 4TH CALIFORNIA | $600,000 |
| 33, SOUTHERN RESEARCH STATION | SOUTHERN RESEARCH STATION | SOUTHERN RESEARCH STATION EXPERIMENTAL FOREST WEIR REPAIRS | This project repairs weirs that support research across the Southern Research Station Experimental Forests. | 11TH NORTH CAROLINA, 6TH SOUTH CAROLINA | $1,667,000 |
| 33, SOUTHERN RESEARCH STATION | SOUTHERN RESEARCH STATION | OXFORD FOREST HYDROLOGY LABORATORY RENOVATION | This project will renovate the Oxford Forest Hydrology Laboratory. | 1ST MISSISSIPPI | $994,000 |
| 33, SOUTHERN RESEARCH STATION | SOUTHERN RESEARCH STATION | COWEETA HYDROLOGICAL LABORATORY LAB BUILDING RENOVATION | This project will modernize the Coweeta Hydrological Laboratory. | 11TH NORTH CAROLINA | $1,500,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R1, NORTHERN REGION | BEAVERHEAD-DEERLODGE NATIONAL FOREST | GEORGETOWN LAKE BOAT LAUNCH PAVING DEERLODGE COUNTY | This project will replace the boat launches and associated parking located at the highly popular Georgetown Lake. | 1ST MONTANA | $1,850,000 |
| R1, NORTHERN REGION | BEAVERHEAD-DEERLODGE NATIONAL FOREST | BIRCH CREEK CIVILIAN CONSERVATION CORPS CAMP AND RENTAL CABIN DEFERRED MAINTENANCE REDUCTION | This project will repair one of the most intact 1930s Civilian Conservation Corps camps remaining in the nation. | 1ST MONTANA | $435,000 |
| R1, NORTHERN REGION | BITTERROOT NATIONAL FOREST | DEVELOPED RECREATION PAVEMENT PROJECTS | This project addresses pavement maintenance at many popular campgrounds and recreation areas. | 1ST MONTANA | $384,000 |
| R1, NORTHERN REGION | BITTERROOT NATIONAL FOREST | MAGRUDER CORRIDOR DEFERRED MAINTENANCE | This project will improve developed campgrounds, trailheads, and recreation facilities within the historic, unique and popular Magruder Corridor. | 1ST IDAHO, 1ST MONTANA | $1,206,000 |
| R1, NORTHERN REGION | BITTERROOT NATIONAL FOREST | SULA HOUSING & DISTRICT WATER SYSTEM IMPROVEMENTS | This project will replace the pumphouse, piping, and controls with a new water line, storage tank drain valve, and fire hydrant. | 1ST MONTANA | $305,000 |
| R1, NORTHERN REGION | BITTERROOT NATIONAL FOREST | TRAIL BRIDGE DEFERRED MAINTENANCE | This project will replace or repair deficient bridges along multiple trail systems. | 1ST IDAHO, 1ST MONTANA | $461,000 |
| R1, NORTHERN REGION | BITTERROOT NATIONAL FOREST | FORESTWIDE QUARTERS DEFERRED MAINTENANCE | The project will address deferred maintenance at housing facilities across the Forest. | 1ST MONTANA | $655,000 |
| R1, NORTHERN REGION | IDAHO PANHANDLE NATIONAL FORESTS | COEUR D’ALENE CORRIDOR CAMPGROUND RENOVATIONS | This project will renovate two popular concessionaire operated campgrounds located within the Coeur d' Alene River Priority Area. | 1ST IDAHO | $1,170,000 |
| R1, NORTHERN REGION | IDAHO PANHANDLE NATIONAL FORESTS | SAM OWEN CAMPGROUND RENOVATION | This project will replace campground infrastructure, including fire rings, picnic tables, accessible living spaces, new asphalt throughout the campground as well as pull-through sites and camping spurs designed to accommodate recreational vehicles. | 1ST IDAHO | $1,973,000 |
| R1, NORTHERN REGION | IDAHO PANHANDLE NATIONAL FORESTS | NORTH ZONE TRAIL DEFERRED MAINTENANCE- SALMO PRIEST WILDERNESS & RECOMMENDED WILDERNESS | The Salmo Priest Trail System is the only trail system in designated Wilderness on the forest. This project will involve tread repair and heavy brushing on numerous trails. | 1ST IDAHO, 5TH WASHINGTON | $530,000 |
| R1, NORTHERN REGION | IDAHO PANHANDLE NATIONAL FORESTS | CENTRAL ZONE CANFIELD MOUNTAIN TRAILS DEFERRED MAINTENANCE | This project includes tread maintenance, rerouting, reconstruction, and new construction to accomplish a desired trail system that connects to an urban population. | 1ST IDAHO | $773,000 |
| R1, NORTHERN REGION | FLATHEAD NATIONAL FOREST | BOB MARSHALL WILDERNESS HOUSING DEFERRED MAINTENANCE | This project will repair cabins that provide housing for trail crews, firefighters, and volunteers. Basic repairs include new roofing, refinishing floors and painting. Complex upgrades involve replacing a septic system and fixing water systems. | 1ST MONTANA | $775,000 |
| R1, NORTHERN REGION | FLATHEAD NATIONAL FOREST | LINDBERGH LAKE CAMPGROUND DEFERRED MAINTENANCE AND RESOURCE PROTECTION | This project will repair and upgrade the campground to fit current and future user needs. | 1ST MONTANA | $785,000 |
| R1, NORTHERN REGION | CUSTER GALLATIN NATIONAL FOREST | BEARTOOTH BUNKHOUSES HOUSING RENOVATION | This project will repair and improve the Red Lodge South and North bunkhouses to correct human health and safety and structural integrity concerns. | 1ST MONTANA | $260,000 |
| R1, NORTHERN REGION | KOOTENAI NATIONAL FOREST | BOAT RAMP AND DOCK REPAIR AND REPLACEMENT | The project will replace damaged boat docks and repair deteriorating boat launches. | 1ST MONTANA | $1,150,000 |
| R1, NORTHERN REGION | KOOTENAI NATIONAL FOREST | PECK GULCH CAMPGROUND TOILET REPLACEMENT | This project will update or replace toilet facilities. | 1ST MONTANA | $180,000 |
| R1, NORTHERN REGION | HELENA-LEWIS AND CLARK NATIONAL FOREST | LEWIS AND CLARK INTERPRETIVE CENTER EXHIBIT UPDATE | This project will update Lewis and Clark Interpretive Center exhibits. | 1ST MONTANA | $600,000 |
| R1, NORTHERN REGION | HELENA-LEWIS AND CLARK NATIONAL FOREST | LEWIS AND CLARK INTERPRETIVE CENTER DEFERRED MAINTENANCE PHASE 2 | This project will update lighting, windows, paint, exterior facade, and doors. | 1ST MONTANA | $1,025,000 |
| R1, NORTHERN REGION | HELENA-LEWIS AND CLARK NATIONAL FOREST | JUDITH RANGER DISTRICT BUNKHOUSE REPLACEMENT | This project will replace the existing triple-wide bunkhouse with a new stick framed energy efficient and sustainable quarters building. | 1ST MONTANA | $1,060,000 |
| R1, NORTHERN REGION | LOLO NATIONAL FOREST | SAINT REGIS WORKCENTER HOUSING WASTEWATER SYSTEM | This project will replace the wastewater system at the Saint Regis work center. | 1ST MONTANA | $515,737 |
| R1, NORTHERN REGION | LOLO NATIONAL FOREST | RATTLESNAKE RECREATION AREA AND WILDERNESS TRAILHEAD AND TRAIL MAINTENANCE | This project includes paving the main trailhead parking lot, deferred maintenance on the Sawmill Gulch Road, replacement of trailhead entrance signs and kiosks, and deferred maintenance on wilderness trails. | 1ST MONTANA | $542,761 |
| R1, NORTHERN REGION | LOLO NATIONAL FOREST | HISTORIC NINEMILE HOUSING WATER AND WASTEWATER SYSTEM REPLACEMENT | This project will replace the water and wastewater systems at the Historic Ninemile Ranger Station. | 1ST MONTANA | $1,300,000 |
| R1, NORTHERN REGION | LOLO NATIONAL FOREST | RECONSTRUCTION OF T-150 MISSOULA AREA MASTER PLAN PHASE I, FORT MISSOULA FACILITIES | This project will eliminate health and safety concerns by reconstructing a building meeting the historic obligations to Fort Missoula. | 1ST MONTANA | $6,324,263 |
| R1, NORTHERN REGION | NEZ PERCE-CLEARWATER NATIONAL FOREST | RURAL AIRSTRIP DEFERRED MAINTENANCE AND HAZARD MITIGATION | This project mitigates airfield hazards and addresses deferred maintenance on the Forest's seven backcountry airstrips. | 1ST IDAHO | $627,000 |
| R1, NORTHERN REGION | NEZ PERCE-CLEARWATER NATIONAL FOREST | POWELL DUPLEX HOUSING ROOF REPAIR | Powell Duplex suffered severe water damage due to roof failure. This project will replace the roof, ceiling, flooring, and carpeting. | 1ST IDAHO | $305,000 |
| R1, NORTHERN REGION | DAKOTA PRAIRIE GRASSLANDS | MAAH DAAH HEY TRAIL BRIDGE REPLACEMENTS | This project will construct trail bridges on Maah Daah Hey Trail. | NORTH DAKOTA AT LARGE | $390,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R2, ROCKY MOUNTAIN REGION | R2, ROCKY MOUNTAIN REGION | MULTI-REGION CONTINENTAL DIVIDE TRAIL DEFERRED TRAIL MAINTENANCE | The Continental Divide National Scenic Trail (CDNST) is one of the world's premiere long-distance trails. This project will address general, non-structural deferred trail maintenance. | 1ST WYOMING, 2ND COLORADO, 2ND IDAHO, 2ND NEW MEXICO, 3RD COLORADO, 3RD NEW MEXICO, 5TH COLORADO | $4,802,000 |
| R2, ROCKY MOUNTAIN REGION | BIGHORN NATIONAL FOREST | GREYBULL WORK CENTER BARRACKS RENOVATIONS | This project will address deferred maintenance at the barracks at Greybull Work Center, which serves as the duty station for the Wyoming Hotshots. | WYOMING AT LARGE | $236,130 |
| R2, ROCKY MOUNTAIN REGION | BIGHORN NATIONAL FOREST | GREYBULL WORK CENTER SITE IMPROVEMENTS | This project will increase employee housing by constructing three additional camper trailer pads with full utility hookups and placing new aggregate throughout the work center parking lot. | WYOMING AT LARGE | $394,842 |
| R2, ROCKY MOUNTAIN REGION | BIGHORN NATIONAL FOREST | GREYBULL WORK CENTER HOTSHOT OFFICE/SHOP RENOVATION | Renovations to the Greybull Work Center office/shop will include a new roof, painting, flooring and bathroom repairs. | WYOMING AT LARGE | $1,251,481 |
| R2, ROCKY MOUNTAIN REGION | BIGHORN NATIONAL FOREST | BURGESS RANGER STATION BATHHOUSE MAINTENANCE | Project will replace an aging bathhouse at Burgess Ranger Station and upgrade the recreational vehicle hookups for use by seasonal employees and campground hosts. | WYOMING AT LARGE | $200,000 |
| R2, ROCKY MOUNTAIN REGION | BIGHORN NATIONAL FOREST | SHERIDAN MUNICIPAL WATERSHED ROADS IMPROVEMENT | The project work consists of road surfacing and vegetation removal. | WYOMING AT LARGE | $2,011,000 |
| R2, ROCKY MOUNTAIN REGION | BLACK HILLS NATIONAL FOREST | TINTON ROAD IMPROVEMENTS | This project will improve the road by grading, cleaning culverts, and adding aggregate. | SOUTH DAKOTA AT LARGE | $500,000 |
| R2, ROCKY MOUNTAIN REGION | BLACK HILLS NATIONAL FOREST | LITTLE SPEARFISH WATERSHED TRAIL IMPROVEMENTS | This project will address maintenance and environmental issues on both the Little Spearfish trail and 76 Trail. | SOUTH DAKOTA AT LARGE | $120,000 |
| R2, ROCKY MOUNTAIN REGION | BLACK HILLS NATIONAL FOREST | STRAWBERRY DAM REHABILITATION | This project will include updating a fishing pier, dredging the lake, and rehabilitating the outlet works and spillway. | SOUTH DAKOTA AT LARGE | $700,000 |
| R2, ROCKY MOUNTAIN REGION | GRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTS | HORSE RANCH PARK/CLIFF CREEK TRAILHEAD RECONSTRUCTION | This project will redesign existing parking, camping and stock features will help define parking, reduce overuse impacts and upgrade recreational amenities. | 3RD COLORADO | $316,000 |
| R2, ROCKY MOUNTAIN REGION | GRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTS | LIZARDHEAD PASS SAFETY PROJECT | This project will reconstruct the trailhead parking lot to make it safer for winter use. | 3RD COLORADO | $300,000 |
| R2, ROCKY MOUNTAIN REGION | GRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTS | WARD LAKE GUARD STATION HOUSES REPAIRS | This project includes building repairs to three of the buildings at the Ward Lake Guard Station including the Dwelling, Administrative Building, and the Bunkhouse. | 3RD COLORADO | $522,000 |
| R2, ROCKY MOUNTAIN REGION | GRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTS | WEST MUDDY GUARD STATION MAJOR RENOVATION | This project will complete a major renovation of the West Muddy Guard Station, including installation of new well and updated sewer system. | 3RD COLORADO | $626,000 |
| R2, ROCKY MOUNTAIN REGION | GRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTS | COLD SPRINGS GUARD STATION REPAIRS | This Project will complete interior and exterior repairs at Cold Springs Guard Station. | 3RD COLORADO | $284,000 |
| R2, ROCKY MOUNTAIN REGION | GRAND MESA, UNCOMPAHGRE, AND GUNNISON NATIONAL FORESTS | FOREST WIDE KIOSK REPLACEMENT | This project will update public facing information and display trail locations more accurately. | 3RD COLORADO | $288,000 |
| R2, ROCKY MOUNTAIN REGION | MEDICINE BOW-ROUTT NATIONAL FORESTS | WYOMING CAMPGROUND DEFERRED MAINTENANCE | This project will resurface and extend parking spurs and redefine living spaces and tent pads. | WYOMING AT LARGE | $400,000 |
| R2, ROCKY MOUNTAIN REGION | NEBRASKA NATIONAL FOREST | BESSEY 4 H RESIDENCE | This project will bring the structure into code compliance to provide housing for temporary/seasonal employees. | 3RD NEBRASKA | $708,000 |
| R2, ROCKY MOUNTAIN REGION | NEBRASKA NATIONAL FOREST | CIRCLE ROAD AGGREGATE PLACEMENT AND GRADING | This project will address road reconditioning and placement of aggregate. | 3RD NEBRASKA | $216,000 |
| R2, ROCKY MOUNTAIN REGION | NEBRASKA NATIONAL FOREST | FOREST WIDE TOILET REPLACEMENT | This project will replace existing fiberglass toilet units with concrete toilet facilities. | SOUTH DAKOTA AT LARGE, 3RD NEBRASKA | $855,000 |
| R2, ROCKY MOUNTAIN REGION | RIO GRANDE NATIONAL FOREST | UTE CREEK "BLUE HOLE" TRAIL PROJECT | This project will address destabilization issues on the first 6 miles of Ute Creek Trail to prevent sedimentation into the Rio Grande River Headwaters from connector streams and provide safer access to the public. | 3RD COLORADO | $130,000 |
| R2, ROCKY MOUNTAIN REGION | RIO GRANDE NATIONAL FOREST | BRIDGE DEFERRED MAINTENANCE AND REPAIRS | This project will repair and maintain road bridges throughout the forest. | 3RD COLORADO | $120,000 |
| R2, ROCKY MOUNTAIN REGION | RIO GRANDE NATIONAL FOREST | STONE CELLAR GUARD STATION DEFERRED MAINTENANCE | The project will make exterior and interior repairs at Stone Cellar Guard Station. | 3RD COLORADO | $105,000 |
| R2, ROCKY MOUNTAIN REGION | RIO GRANDE NATIONAL FOREST | OLD TOILET BUILDING REPLACEMENTS | This project will replace vault toilets. | 3RD COLORADO | $540,000 |
| R2, ROCKY MOUNTAIN REGION | ARAPAHO AND ROOSEVELT NATIONAL FORESTS | HERMAN GULCH TOILET REPLACEMENT | This project will install a precast concrete vault toilet. The existing toilet has been irreparably damaged. | 2ND COLORADO | $167,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | MONUMENT FIRE CENTER DWELLING DEFERRED MAINTENANCE | The Monument Fire Center includes living and working facilities for the Pike Interagency Hotshot and Monument Helitack crews. This project will address deferred maintenance at the dwelling quarters facility. | 5TH COLORADO | $400,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | LAKE ISABEL REPAVING PHASE TWO | This project will improve the roadway and parking area. | 3RD COLORADO | $1,999,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | SOUTH PARK DISTRICT OFFICE REHAB AND PIKES PEAK RANGER DISTRICT PARKING LOT AND GATE REPLACEMENT | This project will repair the deteriorated parking lot at Pikes Peak Ranger District and rehabilitate the office at South Park Ranger District. | 5TH COLORADO | $500,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | LEADVILLE QUARTERS REHABILITATION | This project will rehabilitate two dwellings. Both facilities are historically significant heritage buildings and important quarters assets for District staff. | 3RD COLORADO | $1,020,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | LAKE ISABEL ACCESSIBLE TRAIL - PHASE ONE | This project will reconstruct an accessible trail and parking area to meet Forest Service accessibility standards. | 3RD COLORADO | $535,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | SOUTH PARK FAIRPLAY WORK CENTER REHABILITATION AND UTILITY IMPROVEMENT | This project will repair the sewer system, replace trailers, and address deferred maintenance in the bunkhouses and dwelling. | 5TH COLORADO | $550,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | LEADVILLE CRYSTAL LAKES BARRACKS REHABILITATION | The Crystal Lakes Barracks is over 40 years old and in need of many repairs and upgrades for the health and safety of the tenants. | 3RD COLORADO | $605,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | LEADVILLE CRYSTAL LAKES DWELLING ONE REHABILITATION (BROWN HOUSE) | This facility houses permanent and seasonal Forest Service employees. It needs many repairs and upgrades for the health and safety of the tenants. | 3RD COLORADO | $600,000 |
| R2, ROCKY MOUNTAIN REGION | PIKE AND SAN ISABEL NATIONAL FORESTS | LEADVILLE CRYSTAL LAKE WATER TREATMENT | This project will install a surface water treatment facility to comply with State of Colorado drinking water requirements at the work center. | 3RD COLORADO, 7TH COLORADO | $510,000 |
| R2, ROCKY MOUNTAIN REGION | SAN JUAN NATIONAL FOREST | MCPHEE RESERVOIR ROAD RESURFACING | This project will overlay pavement on existing roads in McPhee Reservoir to the boat launch ramp at the Marina. | 3RD COLORADO | $750,000 |
| R2, ROCKY MOUNTAIN REGION | SAN JUAN NATIONAL FOREST | PAGOSA FIRE HERITAGE | This project will renovate the historic Eight Mile fire lookout and communication tower. | 3RD COLORADO | $100,000 |
| R2, ROCKY MOUNTAIN REGION | SAN JUAN NATIONAL FOREST | MCPHEE BUILDINGS AND RECREATION ACCESS DEFERRED MAINTENANCE | This project will renovate buildings and features supporting developed recreation, trails, water quality, partnerships and operations near the McPhee Reservoir. | 3RD COLORADO | $370,000 |
| R2, ROCKY MOUNTAIN REGION | SAN JUAN NATIONAL FOREST | BIG AL TRAIL | This project will bring the trail up to accessible trail standards. | 3RD COLORADO | $140,000 |
| R2, ROCKY MOUNTAIN REGION | SAN JUAN NATIONAL FOREST | PROVANCHER RANCH RESTORATION | This project will stabilize and repair a 1900 heritage cabin and barn. | 3RD COLORADO | $185,000 |
| R2, ROCKY MOUNTAIN REGION | SHOSHONE NATIONAL FOREST | FOREST WIDE TOILET REPLACEMENT | This project will replace toilets with new concrete building vault toilets. | WYOMING AT LARGE | $360,000 |
| R2, ROCKY MOUNTAIN REGION | SHOSHONE NATIONAL FOREST | FOREST WIDE TRAILS DEFERRED MAINTENANCE TWO | This project will rebuild and relocate unserviceable trail sections to sustainable locations and address major trail issues such as manifesting chronic erosion, rock slabs, rockslides, realignment, wetland crossings, and dangerous trail bridge. | WYOMING AT LARGE | $250,000 |
| R2, ROCKY MOUNTAIN REGION | SHOSHONE NATIONAL FOREST | SOUTH ZONE FIRST FOREST/FACILITY MAINTENANCE | This project will preserve historically significant structures in four locations by reducing deferred maintenance. | WYOMING AT LARGE | $100,000 |
| R2, ROCKY MOUNTAIN REGION | SHOSHONE NATIONAL FOREST | FOREST WIDE TRAILS DEFERRED MAINTENANCE | This project will rebuild and relocate unserviceable trail sections to sustainable locations to avoid chronic river washouts, address poor trail tread contributing to manifesting erosional issues, and replace hazardous bridges and puncheon. | WYOMING AT LARGE | $207,000 |
| R2, ROCKY MOUNTAIN REGION | WHITE RIVER NATIONAL FOREST | CHAPMAN DAM AND CAMPGROUND IMPROVEMENTS | This project includes repairs to Chapman Dam and partial replacement of the water system at Chapman Campground. | 3RD COLORADO | $1,100,000 |
| R2, ROCKY MOUNTAIN REGION | WHITE RIVER NATIONAL FOREST | BLANCO RANGER HOUSE REMODEL | This project will reconstruct the entire interior of the Blanco Ranger house. | 3RD COLORADO | $515,000 |
| R2, ROCKY MOUNTAIN REGION | WHITE RIVER NATIONAL FOREST | FOREST-WIDE PARTNERSHIP TRAIL PROJECT THREE | This project will complete deferred maintenance on trails across the White River National Forest's expansive and heavily used trail system. | 2ND COLORADO, 3RD COLORADO | $1,375,056 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R3, SOUTHWESTERN REGION | CARSON NATIONAL FOREST | CANJILON LAKES CAMPGROUND ROAD - PAVEMENT REPLACEMENT | This project addresses the maintenance needs on Alkali Spring Road which accesses the Canjilon Lakes area. | 3RD NEW MEXICO | $4,100,000 |
| R3, SOUTHWESTERN REGION | CARSON NATIONAL FOREST | WATER SYSTEM IMPROVEMENTS | This project will replace the existing exterior underground distribution drinking water system. | 3RD NEW MEXICO | $500,000 |
| R3, SOUTHWESTERN REGION | CARSON NATIONAL FOREST | CANJILON LAKES CAMPGROUND IMPROVEMENT | This project will address deferred maintenance at Canjilon Lakes Campground. | 3RD NEW MEXICO | $575,000 |
| R3, SOUTHWESTERN REGION | COCONINO NATIONAL FOREST | CAVE SPRINGS CAMPGROUND RECONSTRUCTION PROJECT | The campground requires improvements to meet current recreational camper sizes and requirements to function properly including replacing vault toilets and changing direction of one camping loop. | 1ST ARIZONA, 2ND ARIZONA | $1,900,000 |
| R3, SOUTHWESTERN REGION | COCONINO NATIONAL FOREST | NFSR 516(AZ SNOWBOWL ROAD) PAVEMENT REHABILITATION | This project includes asphalt surfacing, road reconditioning, drainage, and safety improvements over the entire Snowbowl Road. | 1ST ARIZONA | $14,600,000 |
| R3, SOUTHWESTERN REGION | CORONADO NATIONAL FOREST | SANTA RITA WELLS | This project will drill and develop one well each at Florida Work Center, Bog Spring Campground, and Kent Springs Cabin to replace spring sources in wilderness. | 2ND ARIZONA, 6TH ARIZONA, 7TH ARIZONA, 8TH ARIZONA | $980,000 |
| R3, SOUTHWESTERN REGION | CORONADO NATIONAL FOREST | SABINO CANYON PARKING ENHANCEMENT | This project will improve the Sabino Canyon Recreation Area parking areas. | 6TH ARIZONA | $125,000 |
| R3, SOUTHWESTERN REGION | KAIBAB NATIONAL FOREST | OAK HILL DECOMMISSION AND KEYHOLE SINK TRAILHEAD RELOCATION | This project will decommission Oak Hill parking lot and snow play site and construct a new trailhead for Keyhole Sink. | 1ST ARIZONA, 2ND ARIZONA | $110,000 |
| R3, SOUTHWESTERN REGION | KAIBAB NATIONAL FOREST | NORTH KAIBAB TRAILER PADS/HOUSING UNIT | This project will upgrade existing recreation vehicle pads at work center sites. | 1ST ARIZONA | $325,000 |
| R3, SOUTHWESTERN REGION | KAIBAB NATIONAL FOREST | TUSAYAN TRAILER PAD/ HOUSING UNIT | This project will upgrade existing recreational vehicle pads. | 1ST ARIZONA | $115,000 |
| R3, SOUTHWESTERN REGION | SANTA FE NATIONAL FOREST | DISTRICT OFFICE & WAREHOUSE ROOF REPLACEMENTS | This project will replace the metal roofs on the Coyote Ranger District Office and Warehouse. | 3RD NEW MEXICO | $200,000 |
| R3, SOUTHWESTERN REGION | SANTA FE NATIONAL FOREST | CABIN RENTAL READINESS PROJECTS | This project address deferred maintenance to maintain historic character and convert to rental cabins. | 3RD NEW MEXICO | $150,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R4, INTERMOUNTAIN REGION | ASHLEY NATIONAL FOREST | FLAMING GORGE NATIONAL RECREATION AREA WATER SYSTEMS BUCKBOARD AND HIDEOUT | The project will rehabilitate and upgrade the two water system treatment facilities, distribution lines, storage tanks, and other necessary items to reduce maintenance and operations needs and ensure potable water. | WYOMING AT LARGE, 1ST UTAH | $3,774,000 |
| R4, INTERMOUNTAIN REGION | ASHLEY NATIONAL FOREST | RED CANYON CORRIDOR PAVING | This project would repave roads, parking areas, and accessible paved trails at the Red Canyon Visitor Center overlook. | 1ST UTAH | $3,550,000 |
| R4, INTERMOUNTAIN REGION | BRIDGER-TETON NATIONAL FOREST | GREYS RIVER CORRIDOR PHASE 3 | This project will conduct aggregate resurfacing. | WYOMING AT LARGE | $1,000,000 |
| R4, INTERMOUNTAIN REGION | DIXIE NATIONAL FOREST | FORESTWIDE TRAIL MAINTENANCE | This project will improve hiker, mountain-biker and equestrian experiences by mitigating years of deferred trail maintenance. | 2ND UTAH | $730,000 |
| R4, INTERMOUNTAIN REGION | DIXIE NATIONAL FOREST | PINE VALLEY DAM SPILLWAY CAPACITY AND LIQUIFACTION MITIGATION | The Pine Valley dam crest will be raised. The low water outlet will be replaced, the upstream and downstream slopes will be stabilized, and the upstream slope armoring will be replaced. | 2ND UTAH | $3,950,000 |
| R4, INTERMOUNTAIN REGION | MANTI-LA SAL NATIONAL FOREST | SOUTH ZONE CAMPGROUND FENCES | This project will repair campground fencing. The forest around the campgrounds is grazed by livestock. | 3RD COLORADO, 3RD UTAH | $690,000 |
| R4, INTERMOUNTAIN REGION | MANTI-LA SAL NATIONAL FOREST | PHASE 2 & 3 PICNIC TABLE AND FIRE RINGS | This project will replace picnic tables and fire rings in campgrounds. | 3RD UTAH, 4TH UTAH | $550,000 |
| R4, INTERMOUNTAIN REGION | MANTI-LA SAL NATIONAL FOREST | JOES VALLEY CAMPGROUND RESTORATION | The Joes Valley Campground project seeks to address deferred maintenance of the interior campground roads, spurs, and parking areas, while also providing an additional opportunity for group camping. | 2ND UTAH, 3RD UTAH | $1,139,900 |
| R4, INTERMOUNTAIN REGION | MANTI-LA SAL NATIONAL FOREST | BAKER SITE HOUSING DEFERRED MAINTENANCE | This project will remodel the interior and exterior of the dwelling and replace the concrete pad in the garage. | 2ND UTAH | $490,000 |
| R4, INTERMOUNTAIN REGION | SALMON-CHALLIS NATIONAL FOREST | DAGGER FALLS TRAIL BRIDGE CRITICAL REPAIRS | This project will rehabilitate the Dagger Falls Trail Bridge. | 1ST IDAHO, 2ND IDAHO | $50,000 |
| R4, INTERMOUNTAIN REGION | SAWTOOTH NATIONAL FOREST | BIG SMOKY ADMINISTRATION SITE HOUSING DEFERRED MAINTENANCE | The project will repair the sewer line, grind asphalt pavement, and install membranes for sewer cell lagoons. | 1ST IDAHO, 2ND IDAHO | $730,000 |
| R4, INTERMOUNTAIN REGION | CARIBOU-TARGHEE NATIONAL FOREST | ISLAND PARK ADMIN SITE HOUSING SEWER SYSTEM REPLACEMENT | This project will replace an aging wastewater system that is failing, creating health hazards from wastewater backing up into employee residences. | 2ND IDAHO | $780,000 |
| R4, INTERMOUNTAIN REGION | CARIBOU-TARGHEE NATIONAL FOREST | ISLAND PARK ADMIN SITE HOUSING ROOF REPLACEMENTS | This project will replace aging roofs at housing units on the compound. | 2ND IDAHO | $525,000 |
| R4, INTERMOUNTAIN REGION | CARIBOU-TARGHEE NATIONAL FOREST | CARIBOU-TARGHEE TRAIL DEFERRED MAINTENANCE | The project will reconstruct, revitalize, and restore recreation sites and trails. | WYOMING AT LARGE, 2ND IDAHO | $650,000 |
| R4, INTERMOUNTAIN REGION | CARIBOU-TARGHEE NATIONAL FOREST | MESA FALLS ROAD MAINTENANCE PROJECT | This project will repair Mesa Falls Road, which accesses the Mesa Falls Visitors Site. | 2ND IDAHO | $751,000 |
| R4, INTERMOUNTAIN REGION | CARIBOU-TARGHEE NATIONAL FOREST | MESA FALLS RECREATION AREA DEFERRED MAINTENANCE | This project will replace the roof at Big Falls Inn and improve boardwalks, pedestrian infrastructure and parking areas. | 2ND IDAHO | $2,404,000 |
| R4, INTERMOUNTAIN REGION | HUMBOLDT-TOIYABE NATIONAL FOREST | HOUSING DEFERRED MAINTENANCE | This project includes finishing basements, remodeling bathrooms, replacing waterlines, and replacing furnaces. | 25TH CALIFORNIA, 2ND NEVADA, 3RD NEVADA, 4TH NEVADA | $758,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R5, PACIFIC SOUTHWEST REGION | ANGELES NATIONAL FOREST | CHILAO CAMPGROUND COMPLEX - WATER SYSTEM REHABILITATION | This project will install new pipelines and valves and rehabilitate the water tanks. | 26TH CALIFORNIA, 27TH CALIFORNIA, 28TH CALIFORNIA, 33RD CALIFORNIA | $2,700,000 |
| R5, PACIFIC SOUTHWEST REGION | ANGELES NATIONAL FOREST | CHANTRY FLATS PICNIC AREA | This project will demolish the barracks and construct a new shuttle stop. | 22ND CALIFORNIA, 26TH CALIFORNIA, 27TH CALIFORNIA | $485,000 |
| R5, PACIFIC SOUTHWEST REGION | ANGELES NATIONAL FOREST | SAN GABRIEL MONUMENT BARRACKS RECONSTRUCTION | The project will repair barracks and update existing water and sanitation systems. | 26TH CALIFORNIA, 27TH CALIFORNIA, 28TH CALIFORNIA | $2,500,000 |
| R5, PACIFIC SOUTHWEST REGION | CLEVELAND NATIONAL FOREST | RENOVATE FALCON GROUP CAMPGROUND AND TRAILS | This project renovates a very popular group campground, including replacement of deteriorated amenities and access improvements. | 40TH CALIFORNIA, 44TH CALIFORNIA, 45TH CALIFORNIA | $1,110,000 |
| R5, PACIFIC SOUTHWEST REGION | INYO NATIONAL FOREST | WHITNEY ZONE TRAILS STORM DAMAGE REPAIR | The project will improve storm resiliency and public access. Work includes short re-alignments, structure construction, and re-establishing the corridor and tread. | 25TH CALIFORNIA | $240,000 |
| R5, PACIFIC SOUTHWEST REGION | KLAMATH NATIONAL FOREST | RUSSIAN WILDERNESS PACIFIC CREST TRAIL AND FEEDER TRAILS DEFERRED MAINTENANCE | This project will address deferred maintenance and improve visitor safety by logging-out fallen trees, clearing brush from trail, repairing trail tread and repairing drainage structures. | 1ST CALIFORNIA, 2ND CALIFORNIA | $695,000 |
| R5, PACIFIC SOUTHWEST REGION | LOS PADRES NATIONAL FOREST | FACILITIES REPAIRS | This project will address deferred maintenance of facilities that support temporary quarters, fire, and administration program areas. | 17TH CALIFORNIA, 22ND CALIFORNIA, 23RD CALIFORNIA, 24TH CALIFORNIA | $1,385,000 |
| R5, PACIFIC SOUTHWEST REGION | MENDOCINO NATIONAL FOREST | FOUTS SPRINGS CRITICAL WATER SYSTEM REPAIRS | This project will replace filters, re-configure piping between components and replace the pressure tank. | 1ST CALIFORNIA, 3RD CALIFORNIA | $120,000 |
| R5, PACIFIC SOUTHWEST REGION | MODOC NATIONAL FOREST | FORESTWIDE RECREATION SITE MAINTENANCE | This project will repair campground and trailhead loops as well as replace kiosks and signage at sites. | 1ST CALIFORNIA, 2ND CALIFORNIA, 4TH CALIFORNIA | $800,000 |
| R5, PACIFIC SOUTHWEST REGION | SIX RIVERS NATIONAL FOREST | BUCK MOUNTAIN ROAD RESTORATION | This project consists of replacing failed culverts on Buck Mountain Road 1N10, near the crossing with Kuntz Creek, as well as grinding of failed pavement to create aggregate surfacing change within Forest Road 1N30. | 01 - FIRST DISTRICT, 1ST CALIFORNIA | $1,000,000 |
| R5, PACIFIC SOUTHWEST REGION | SIX RIVERS NATIONAL FOREST | TRAIL MAINTENANCE MAD RIVER DISTRICT | This project includes brushing, removal of logs, and tread work on trails. | 1ST CALIFORNIA, 2ND CALIFORNIA | $200,000 |
| R5, PACIFIC SOUTHWEST REGION | SIX RIVERS NATIONAL FOREST | TRAIL MAINTENANCE GASQUET NATIONAL RECREATION AREA | This project includes brushing, removal of logs, and tread work on trails. | 1ST CALIFORNIA | $211,000 |
| R5, PACIFIC SOUTHWEST REGION | PLUMAS NATIONAL FOREST | UPPER GOLDEN TROUT BRIDGE REPLACEMENT | The Upper Golden Trout Bridge was destroyed by the North Complex Fire. This project will rebuild the bridge. | 4TH CALIFORNIA | $2,396,444 |
| R5, PACIFIC SOUTHWEST REGION | PLUMAS NATIONAL FOREST | BECKWOURTH DISTRICT OFFICE WATER SYSTEM REPLACEMENT | This project will replace the water distribution lines and provide upgrades to the water system. | 2ND CALIFORNIA, 4TH CALIFORNIA | $605,000 |
| R5, PACIFIC SOUTHWEST REGION | SAN BERNARDINO NATIONAL FOREST | APPLEWHITE CAMPGROUND AND PICNIC AREA ACCESSIBILITY IMPROVEMENTS | This project includes pavement rehabilitation, replacement of one campground restroom facility, installation of two pavilion structures, and improved connectivity between sites with an advanced warning crosswalk. | 26TH CALIFORNIA, 28TH CALIFORNIA, 35TH CALIFORNIA | $3,350,000 |
| R5, PACIFIC SOUTHWEST REGION | SAN BERNARDINO NATIONAL FOREST | GROUT BAY & GRAYS PEAK DAY USE AREA RECONSTRUCTION | This project will replace restrooms, rehabilitate paved roads and parking lots, and rehabilitate the water distribution system. | 23RD CALIFORNIA, 35TH CALIFORNIA, 41ST CALIFORNIA | $1,500,000 |
| R5, PACIFIC SOUTHWEST REGION | SHASTA TRINITY NATIONAL FOREST | HISTORIC RECREATION CABIN AND BARN ROOF REPLACEMENT | This project will replace the deteriorated cedar shake roofs at historic recreation rental cabins with a fire-resistant roof. This project will also replace the metal roof at the historic Animal Pack Stock barn. | 1ST CALIFORNIA, 2ND CALIFORNIA | $335,000 |
| R5, PACIFIC SOUTHWEST REGION | SHASTA TRINITY NATIONAL FOREST | ASH CREEK GUARD STATION MULTI YEAR | This project will replace the engine garage and remove warehouses and the electrical building. | 2ND CALIFORNIA | $4,000,000 |
| R5, PACIFIC SOUTHWEST REGION | SIERRA NATIONAL FOREST | ADMINISTRATIVE AND RECREATION FACILITIES REHABILITATION | The project will rehabilitate facilities that support the stock and wilderness program. | 4TH CALIFORNIA | $6,767,000 |
| R5, PACIFIC SOUTHWEST REGION | STANISLAUS NATIONAL FOREST | RIVERSIDE DAY USE AREA REHABILITATION | This project will rehabilitate the Riverside Day Use and Picnic Area. | 4TH CALIFORNIA, 5TH CALIFORNIA | $120,000 |
| R5, PACIFIC SOUTHWEST REGION | STANISLAUS NATIONAL FOREST | RIM OF THE WORLD TOILET REPLACEMENT | This project will replace the heavily used single vault prefabricated toilet located at the Rim of the World observation site with a new double vault facility. | 5TH CALIFORNIA | $120,000 |
| R5, PACIFIC SOUTHWEST REGION | LAKE TAHOE BASIN MGT UNIT | NEVADA BEACH DAY USE AND CAMPGROUND WATER SYSTEM UPGRADES | This project involves the replacement of the water mains at the Nevada Beach Day Use Area, which services the existing six bathrooms adjacent to the campground, and services housing barracks. | 2ND NEVADA | $450,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R6, PACIFIC NORTHWEST REGION | FREMONT-WINEMA NATIONAL FORESTS | COTTONWOOD CAMPGROUND TRAIL BRIDGE REPLACEMENT | This project will replace the deteriorating bridge with a new premanufactured weathering steel truss bridge. | 2ND OREGON | $186,000 |
| R6, PACIFIC NORTHWEST REGION | GIFFORD PINCHOT NATIONAL FOREST | NORTH FORK GUARD STATION RESTORATION | North Fork Guard Station is a historic structure that needs major renovation and repair to make it a functioning building again. | 3RD WASHINGTON | $200,000 |
| R6, PACIFIC NORTHWEST REGION | MT BAKER-SNOQUALMIE NATIONAL FOREST | FOREST RESIDENCES FLOORING BUNDLE | This project will replace flooring in residences. | 2ND WASHINGTON | $331,000 |
| R6, PACIFIC NORTHWEST REGION | MT HOOD NATIONAL FOREST | LAKE BRANCH BRIDGE REPLACEMENT | This project replaces Lake Branch Bridge, which failed a fracture critical test. This bridge is currently shut down but is normally the secondary emergency egress from Lost Lake, a major recreation site. | 2ND OREGON | $2,740,000 |
| R6, PACIFIC NORTHWEST REGION | SIUSLAW NATIONAL FOREST | QUARTERS AND FACILITIES DEFERRED MAINTENANCE REDUCTION | This project involves maintenance and restoration of quarters and other administrative and recreation buildings. | 1ST OREGON, 3RD OREGON, 4TH OREGON, 5TH OREGON | $2,165,000 |
| R6, PACIFIC NORTHWEST REGION | WALLOWA WHITMAN NATIONAL FOREST | NORTH ZONE HOUSING REPAIRS AND DM | This project will remodel and recondition existing living quarters at the Sled Springs Work Center and the Wallowa Lake House. | 2ND OREGON | $500,000 |
| R6, PACIFIC NORTHWEST REGION | WALLOWA WHITMAN NATIONAL FOREST | WALLOWA MOUNTAIN LOOP ROAD SCENIC BYWAY PAVEMENT AND IMPROVEMENTS | This project will reconstruct the first section of the 39 Road from the forest boundary to Salt Creek Summit. | 2ND OREGON | $6,100,000 |
| R6, PACIFIC NORTHWEST REGION | OKANOGAN-WENATCHEE NATIONAL FORESTS | FIELDS POINT PUBLIC FERRY DOCK REPAIRS | The fixed pier, floating dock, and pedestrian ramp are at the end of service life and require replacement. | 8TH WASHINGTON | $2,610,000 |
| R6, PACIFIC NORTHWEST REGION | OKANOGAN-WENATCHEE NATIONAL FORESTS | CLE ELUM BUNKHOUSE RENOVATION | This project will renovate Cle Elum Administrative Site bunkhouses, including roof and window replacement, new flooring and kitchen counters, and bathroom remodel. | 4TH WASHINGTON | $550,000 |
| R6, PACIFIC NORTHWEST REGION | COLVILLE NATIONAL FOREST | FOREST WIDE DISTRICT HOUSING IMPROVEMENTS | This project will improve employee housing across the forest by remodeling existing bunkhouses and houses to accommodate additional persons as well as to improve amenities and accessibility. | 5TH WASHINGTON | $270,000 |
| R6, PACIFIC NORTHWEST REGION | COLVILLE NATIONAL FOREST | TONASKET ROAD REHABILITATION | This project will rehabilitate asphalt roads. | 5TH WASHINGTON | $5,850,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R8, SOUTHERN REGION | DANIEL BOONE NATIONAL FOREST | GREAT MEADOWS WATER SYSTEM REPLACEMENT | This project will update a well water system installed in the 1970s to a city water system. | 5TH KENTUCKY | $325,000 |
| R8, SOUTHERN REGION | CHATTAHOOCHEE-OCONEE NATIONAL FOREST | CHATTOOGA RIVER DISTRICT-WIDE CHEMICAL TOILET REPLACEMENT | The chemical toilets are irreparable and will be replaced. | 9TH GEORGIA | $720,000 |
| R8, SOUTHERN REGION | CHATTAHOOCHEE-OCONEE NATIONAL FOREST | LAKE CONASAUGA RECREATION AREA REHABILITATION | This project includes maintenance and rehabilitation of existing assets associated with the Lake Conasauga Recreation Area and road access. | 10TH GEORGIA, 14TH GEORGIA | $2,665,000 |
| R8, SOUTHERN REGION | NATIONAL FORESTS IN MISSISSIPPI | BIENVILLE ADMINISTRATIVE SITE REPLACEMENT | This project will decommission the current district office and perform a general renovation on the main work center building and add a new Ranger office to house both district office and work center personnel at the same location. | 3RD MISSISSIPPI | $11,000,000 |
| R8, SOUTHERN REGION | NATIONAL FORESTS IN MISSISSIPPI | DAVIS LAKE RECREATION AREA-REPLACE WATER LINES | This project includes maintenance of the existing water system that supplies water to the Davis Lake Recreation Area and the unit Work Center. | 1ST MISSISSIPPI | $161,000 |
| R8, SOUTHERN REGION | NATIONAL FORESTS IN MISSISSIPPI | CHEWALLA RECREATION AREA BATHHOUSE REPLACEMENT | This project will replace an existing, damaged bathhouse with a four-unit waterless vault toilet. | 1ST MISSISSIPPI | $307,000 |
| R8, SOUTHERN REGION | NATIONAL FORESTS IN MISSISSIPPI | TURKEY FORK RECREATION AREA PAVING ACCESS ROAD TO DAY-USE AREA | This project will resurface the access road to the day-use area at Turkey Fork Recreation Area. | 4TH MISSISSIPPI | $140,000 |
| R8, SOUTHERN REGION | GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS | GRINDSTONE RECREATION AREA WASTEWATER TREATMENT PLANT REPLACEMENT | This project will replace the non-operational wastewater treatment and associated collection systems at the Mount Rogers National Recreation Area's Grindstone Recreation Area with on-site treatment. | 6TH VIRGINIA, 9TH VIRGINIA | $4,600,000 |
| R8, SOUTHERN REGION | OZARK-ST FRANCIS NATIONAL FOREST | COVE LAKE DAM TOWER & SLIPLINING | This project will repair the concrete gate tower structure and concrete outlet conduit. | 4TH ARKANSAS | $1,910,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R9, EASTERN REGION | CHIPPEWA NATIONAL FOREST | BOAT ACCESS REPAIR | This project includes upgrading docks, stabilizing boat launch areas with new concrete pads and armoring areas within the access to eliminate erosion. | 8TH MINNESOTA | $315,000 |
| R9, EASTERN REGION | HURON MANISTEE NATIONAL FOREST | HURON_MANISTEE-CONE SHED #2 | This project will repair housing for seasonal staff, partners and volunteers in the historic cone shed building. | 2ND MICHIGAN | $650,000 |
| R9, EASTERN REGION | MARK TWAIN NATIONAL FOREST | ZONE 3 CAMP SITE AMENITY FEATURE REPLACEMENT | This project will replace campsite amenities at multiple campgrounds. | 3RD MISSOURI, 7TH MISSOURI, 8TH MISSOURI | $218,000 |
| R9, EASTERN REGION | OTTAWA NATIONAL FOREST | HUNTER WALKING TRAIL AND TRAILHEAD REHAB | This project will rehabilitate multiple trail complexes and parking areas, kiosks, and signs. | 1ST MICHIGAN | $360,000 |
| R9, EASTERN REGION | SHAWNEE NATIONAL FOREST | FORESTWIDE TOILET REPLACEMENTS | This project will replace aging toilets across the forest. | 12TH ILLINOIS, 15TH ILLINOIS | $295,000 |
| R9, EASTERN REGION | SUPERIOR NATIONAL FOREST | FR152 S. BRULE RIVER BRIDGE REPLACEMENT | This project will replace the road bridge over the South Brule River. The current bridge had a damaged superstructure and is load rated. | 8TH MINNESOTA | $1,520,000 |
| R9, EASTERN REGION | SUPERIOR NATIONAL FOREST | SEAGULL GUARD STATION FIRE QUARTERS REPLACEMENT -DM/COMPLIANCE | The project will replace two bunkhouse cabins with a single dorm-type structure that would meet accessibility and sustainability requirements at Seagull Guard Station. | 8TH MINNESOTA | $1,545,000 |
| R9, EASTERN REGION | HIAWATHA NATIONAL FOREST | MONOCLE LAKE RECREATION ACCESS | This project will repave Monocle Lake Campground. | 1ST MICHIGAN | $602,000 |
| R9, EASTERN REGION | HIAWATHA NATIONAL FOREST | BAY FURNACE CG RECREATION ACCESS | This project will repave Bay Furnace Campground. | 1ST MICHIGAN | $778,450 |
| R9, EASTERN REGION | HOOSIER NATIONAL FOREST | TIPSAW AND BUZZARD ROOST RECREATION AREAS REHABILITATION | This project will reconstruct Tipsaw Main Road and Buzzard Roost Road. Additionally, this project will rehabilitate the boat ramp, parking lot, at other features in Tipsaw Lake Recreation Area. | 8TH INDIANA, 9TH INDIANA | $932,000 |
| R9, EASTERN REGION | CHEQUAMEGON-NICOLET NATIONAL FOREST | CHIPPEWA CAMPGROUND SHOWER HOUSE RECONSTRUCTION | This project will rehabilitate shower houses, one fish cleaning building, and associated site features at the Chippewa Campground. | 7TH WISCONSIN | $1,230,000 |
| R9, EASTERN REGION | WAYNE NATIONAL FOREST | HANGING ROCK OHV TRAIL BRIDGE REPLACEMENT AND TRAIL REROUTE | Users are riding through the stream rather than using the existing bridge which is too narrow for current use. This project will replace the trail bridge and reroute the trail. | 6TH OHIO | $395,000 |
| R9, EASTERN REGION | WAYNE NATIONAL FOREST | ROCK HOUSE TRAIL IMPROVEMENT | This project will repave the trail to comply with Forest Service accessibility standards. | 6TH OHIO | $313,000 |
| R9, EASTERN REGION | ALLEGHENY NATIONAL FOREST | FR 135 BIG MILL CREEK BRIDGE REPLACEMENT | Project will replace Big Mill Creek Bridge. | 15TH PENNSYLVANIA, 5TH PENNSYLVANIA | $863,000 |
| R9, EASTERN REGION | ALLEGHENY NATIONAL FOREST | TWIN LAKES CCC_ERA PAVILION RESTORATION | This project will complete critical repairs at a historic picnic pavilion at Twin Lakes Recreation Area. | 15TH PENNSYLVANIA | $211,000 |
| R9, EASTERN REGION | GREEN MOUNTAIN AND FINGER LAKES NATIONAL FORESTS | GLASTENBURY AND STRATTON OBSERVATION TOWER REPAIRS | This project will complete structural repairs to the Glastenbury and Stratton Mountain observation towers to address public safety concerns. | VERMONT AT LARGE | $662,000 |
| R9, EASTERN REGION | GREEN MOUNTAIN AND FINGER LAKES NATIONAL FORESTS | GROUT POND CAMPGROUND IMPROVEMENT AND ACCESSIBLE UPGRADE | This project will construct additional sites, complete accessible upgrades to trails, access points and boat launches, stabilize eroding soils, and increase parking capacity and waste facilities. | VERMONT AT LARGE | $662,000 |
| R9, EASTERN REGION | MONONGAHELA NATIONAL FOREST | LAKE SHERWOOD DAM REPAIRS | This project will determine the structural integrity of the dam, propose repairs such as replacing the water control valve system, and armor emergency overflow to protect the dam and downstream private property. | 1ST WEST VIRGINIA | $2,000,000 |
| R9, EASTERN REGION | MONONGAHELA NATIONAL FOREST | ROHRBAUGH CABIN RESTORATION | This project will rehabilitate the historic Rohrbaugh Cabin to convert the asset into a recreation rental. | 1ST WEST VIRGINIA | $782,000 |
| R9, EASTERN REGION | WHITE MOUNTAIN NATIONAL FOREST | CORRIDOR 11 ANDRO SNOWMOBILE TRAIL MAINTENANCE/REROUTE | This project will decommission four miles of the existing trail and will relocate this section to a more sustainable location. | 2ND NEW HAMPSHIRE | $730,000 |
| Region | Forest or Station | Project Name | Summary | Congressional District | 2025 Funding |
|---|---|---|---|---|---|
| R10, ALASKA REGION | CHUGACH NATIONAL FOREST | CRESCENT CREEK BRIDGE | This project will replace a bridge that was damaged in a 2018 landslide. | ALASKA AT LARGE | $298,000 |
| R10, ALASKA REGION | CHUGACH NATIONAL FOREST | RUSSIAN RIVER CAMPGROUND RECONSTRUCTION - PHASE THREE | This project will repair the boardwalk and replace the wastewater system. | ALASKA AT LARGE | $1,606,000 |
| R10, ALASKA REGION | CHUGACH NATIONAL FOREST | CROW CREEK ROAD SURFACE REPAIR | This project will complete surface and subsurface repairs to bring the road to code and improve user safety. | ALASKA AT LARGE | $600,000 |
| R10, ALASKA REGION | CHUGACH NATIONAL FOREST | QUARTZ CREEK CAMPGROUND BOARDWALK REPLACEMENT | This project will replace boardwalk in Quartz Creek Campground. | ALASKA AT LARGE | $1,614,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | BEAR PAW TRAIL BRIDGE REPLACEMENT | This project will remove the existing log stringer bridge and construct a new bridge. | ALASKA AT LARGE | $265,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | WINSTANLEY TRAIL BRIDGE REPLACEMENT | This project will re-establish access to Winstanley Lake. It will replace the Winstanley Lake Trail bridge. | ALASKA AT LARGE | $300,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | NORTHERN FOREST QUARTERS REHABILITATION | This project will replace components that have reached the end of their usable life in quarters facilities. | ALASKA AT LARGE | $1,870,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | STARRIGAVAN VALLEY BRIDGES & TRAIL EXTENSION | This project will replace two off-highway vehicle bridges and build an off-highway vehicle trail extension to connect to the existing trail system. | ALASKA AT LARGE | $670,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | JUNEAU COMPOUND HEATING, VENTILATION, AIR CONDITIONING AND ENVELOPE IMPROVEMENTS | This project will improve heating system reliability and efficiency, provide redundant heating sources, reduce condensation on roof, and address ice-dams at various administrative facilities. | ALASKA AT LARGE | $2,000,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | KETCHIKAN BUNKHOUSE REHABILITATION AND HEATING SYSTEM REPLACEMENT | This project will replace components that have reached the end of their usable life at the Ketchikan Bunkhouse. | ALASKA AT LARGE | $1,040,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | LOWER SUNTAHEEN TRAIL VIEWING PLATFORM REPLACEMENT | This project will replace the viewing platform and other wood features, including wood steps and railing leading from the platform to the beach access trail. | ALASKA AT LARGE | $172,000 |
| R10, ALASKA REGION | TONGASS NATIONAL FOREST | JUNEAU RECREATION SITE REPAIRS | This project will replace toilet and signboard roofs, picnic tables, and benches at recreation areas. | ALASKA AT LARGE | $150,000 |