Greenwater Floodplain Restoration

The project proposes to partially restore a 3.5-mile reach of the Greenwater River Floodplain by obliterating approximately 3,830 feet of an abandoned section of Forest Road 70 and 670 feet of Forest Road 7000-002. The project would also install up to 16 engineered log jams to partially restore hydraulic, geomorphic, and habitat complexity in the Greenwater River between mile posts 5.3 and 7.8. The project is located on the Snoqualmie Ranger District near the town of Greenwater.

Location Summary

The project is located within the Greenwater River watershed between Greenwater River Miles 5.3 and 7.8, adjacent to Forest Service Road 70.

District: White River Ranger District

Project Milestones

MilestoneDate
Scoping Start11/17/2008
Comment Period06/24/2009
Objection Period StartN/A
Decision03/25/2010
Implementation07/2010 (Estimated)

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.

If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.

Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public