Skip to main content

Upper Wilson Creek Stream Restoration and Water Developement

We propose to use a mini excavator to restore 100 feet of stream bank washed out by flooding, do minor trail repair, and barricade a non-motorized route while the excavator is in use to bury a pipe for a water development to protect a spring.

Project Summary

Last Updated: 3/18/2015