Silver King Allotment Water Development
The proposed action is to install a collection box at a spring source and pipe water to a 500 gallon livestock water trough via 500 to 700 feet of poly pipe 1.5 inches in diameter. The spring source would be fenced to protect it from trampling.
Project Summary
Location Summary:
Clark Fork-Flints Landscape, John Long Management Area
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/18/2011 |
Decision | 12/2011 (Estimated) |
Implementation | 04/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (9), 36 Cfr 220.6(E)(9)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pintler Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Grazing Management
Project Activity:
Grazing Allotment Management
Current Status:
Completed
Project Decision Information
Silver King Allotment Water Development
Decision Signed Date: 12/20/2011
Forests:
Beaverhead-Deerlodge National Forest
Districts:
Pintler Ranger District
States:
Montana
Counties:
Granite
Legal Land Description:
T9N, R14W Section 19 SW1/4
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Cameron Rasor
88 Business Loop
Philipsburg, MT 59858
406-859-3211
crasor@fs.fed.us
Last Updated: 12/20/2011