Smart Creek Exploration
Based on geological indicators, one specific site would be core drilled to determine if a mineral ore body exists. The results of this exploration would determine whether additional drilling, to define the ore body, would be needed.
Project Summary
Location Summary:
Approximately 10 miles north of Philipsburg, Montana
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/01/2011 |
Decision | 08/2011 (Estimated) |
Implementation | 09/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pintler Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Smart Creek Minerals Exploration
Decision Signed Date: 08/30/2011
Forests:
Beaverhead-Deerlodge National Forest
Districts:
Pintler Ranger District
States:
Montana
Counties:
Granite
Legal Land Description:
T8N, R13W, section 6
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Steve Kelley
88 Business Loop
Philipsburg, MT 59858
406-494-0222
slkelley@fs.fed.us
Last Updated: 9/8/2011