Noble Lake Dam Repair
The Noble Lake Dam was damaged in the spring of 2011 due to heavy runoff and ice plugging the spillway. The owners have proposed repair of the dam by restoring the structure to the original construction design parameters.
Project Summary
Location Summary:
Noble Fork drainage in the Tobacco Root Mountains
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/13/2012 |
Comment Period | 07/20/2012 |
Decision | 09/2012 (Estimated) |
Implementation | 09/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Madison Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Nobel Lake Dam Repair
Decision Signed Date: 09/06/2012
Legal Notice Date: 09/09/2012
Forests:
Beaverhead-Deerlodge National Forest
Districts:
Madison Ranger District
States:
Montana
Counties:
Madison
Legal Land Description:
T3S, R4W, Section 22
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kevin Suzuki
5 Forest Service Road
Ennis, MT 59729
406-682-4253
ksuzuki@fs.fed.us
Last Updated: 9/11/2012