Skip to main content

Vipond Water Development

This project iwould move the Dry Hollow storage tank point of diversion in the Electric Fence pasture about 1740 feet, add a trough, and reconstruct 1.11 mi. of existing pipeline to protect a resource at the original point of diversion.

Project Summary

Last Updated: 10/17/2016