Sibanye Stillwater Mining Company's East Boulder Mine Stage 6 Tailings Storage Facility Amendment

SSMC East Boulder Mine proposes expanding the existing TSF an additional 14 ft. elevation using the same construction and operation methods as approved in stages 1 to 5. Final crest elevation is designed at 6,344 feet.

Project Summary

Last Updated: 11/4/2020