Midstate Elk Lake Powerline Installation
Install an underground power line from an existing pedestal to two cabins. The ditch would be approximately 750 feet long X 3 feet deep X 2 feet wide. A backhoe or trencher would be used to install the line in conduit.
Project Summary
Current Status:
Completed
Location Summary:
Near HWY 46 on the west bank of Elk Lake
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/26/2014 |
| Decision | 08/2014 (Estimated) |
| Implementation | 09/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Bend/Fort Rock Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Midstate Elk Lake Rec. Residence Buried Power Line
Decision Signed Date: 08/22/2014
Legal Notice Date: 08/22/2014
Forests:
Deschutes National Forest
Districts:
Bend/Fort Rock Ranger District
States:
Oregon
Counties:
Deschutes
Legal Land Description:
T 18 S., R 8 E., Section 32 WM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Lisa Dilley
63095 Deschutes Market Rd
Bend, OR 97701
541-383-4025
lldilley@fs.fed.us
Last Updated: 9/17/2014