Skip to main content

CEC Suttle-Sherman Line Replacement Project

Central Electric Cooperative Inc. is proposing to install 6 vaults and 1.3 miles of buried distribution powerline to replace an existing deteriorating line along SW Suttle Sherman Road.

Project Summary

Last Updated: 9/24/2015