Skip to main content

TSID Main Canal Project

The project will replace 3.8 miles of open irrigation canal with high density polyethylene pipe, reducing irrigation water needs by 6 cfs. The 6 cfs will be returned to Whychus Creek through the Department of Water Resources Conserved Water program.

Project Summary

Last Updated: 1/27/2010