Skip to main content

Fish Passage Improvements on Soda and Goose Creeks

The culvert at Goose Cr. will be replaced with a larger diameter culvert pipe; at Soda Cr. with a bridge or pre-facbricated box culvert. Bankfull channel widths would be exceeded at both sites, improving the passage of large wood and debris.

Project Summary

Last Updated: 10/3/2011