Odell Butte - RCC Atlantic dba Verizon Wireless Communication Facility Upgrades
Issuance of a Special Use Permit to Verizon to construct and operate upgrades to existing equipment on Odell Butte, including replacing wooden pole with metal pole, expanding equipment building, and constructing a generator building.
Project Summary
Location Summary:
Odell Butte
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/02/2013 |
| Comment Period | 08/02/2013 |
| Decision | 09/2013 (Estimated) |
| Implementation | 10/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Crescent Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
2013 RCC Atlantic dba Verizon Wireless Facilities Upgrade on Odell Butte
Decision Signed Date: 09/16/2013
Legal Notice Date: 09/16/2013
Forests:
Deschutes National Forest
Districts:
Crescent Ranger District
States:
Oregon
Counties:
Klamath
Legal Land Description:
T24S R7E S26
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Meria Page
136471 Hwy 97 North
Crescent, OR 97733
541-433-3230
mpage01@fs.fed.us
Last Updated: 9/19/2013