Tollgate Fiber Optic Line Replacement
The project would replace deteriorating fiber optic line with a 72 count fiber optic line inside of a 2" conduit. Seven vaults would be installed about every 1,500 feet.
Project Summary
Location Summary:
The project is located along Forest Road 600 and the Tollgate road. T15S; R09E; sections 5 and 25 and T15S;R10E; sections 31 and 32. W.M.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/30/2015 |
| Decision | 08/2015 (Estimated) |
| Implementation | 10/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sisters Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Area Management
Project Activity:
Special Area Management
Current Status:
Completed
Project Decision Information
Tollgate Fiber Optic Line Replacement
Decision Signed Date: 08/05/2015
Forests:
Deschutes National Forest
Districts:
Sisters Ranger District
States:
Oregon
Counties:
Deschutes
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Lisa Dilley
Pine Street and Hwy. 20
Sisters, OR 97759
541-383-4025
lldilley@fs.fed.us
Last Updated: 9/24/2015