Skip to main content

Golden Eagle Mining

Authorize proposed mining exploration. Miner will replace a decaying head frame on an existing vertical shaft, using a rubber tired backhoe to remove old timbers and clean out the shaft. Shoring and a new locking cover will then be installed.

Project Summary

Last Updated: 7/30/2012