Nason Creek (N1) Side Channel Reconnection (AOP) Aquatic Organism Passage

Project will replace a perched 48 inch culvert and install an open bottom, 3 sided concrete culvert under SR 207. The project will improve hydraulic connectivity and fish access to the floodplain that was cut-off by construction of SR207.

Project Summary

Last Updated: 6/6/2018