Pacific Power Distribution Line Rebuild - Nile Hendrix Project
Pacific Power will upgrade 28 miles of distribution line and relocate parts of main distribution feeder to HWY 410 ROW (construct 14 linear miles); eight miles of distribution line will be removed from the current transmission right of way on Forest.
Project Summary
Location Summary:
This section of the Pacific Power transmission line parallels HWY 410 along the Little Naches and American rivers in Yakima county, Washington.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/29/2021 |
Comment Period | 06/2023 (Estimated) |
Objection Period Start | 12/2023 (Estimated) |
Decision | 01/2024 (Estimated) |
Implementation | 01/2024 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Naches Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Facility Improvements/Construction; Special Use Authorizations
Current Status:
Cancelled
Forests:
Okanogan-Wenatchee National Forest
Districts:
Naches Ranger District
States:
Washington
Counties:
Yakima
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jamey Basye
10237 Highway 12
Naches, WA 98937
5098521042
Jamey.Basye@usda.gov
Last Updated: 3/5/2025