Skip to main content

Mission Ridge Lighting CE

The Chair 2 lighting project would require the installation of a continuous trigger wire, some new power lines, and new light poles from the top of the Wenatchee Express Lift to Midway. Existing snowmaking pedestals would be used to power lights.

Project Summary

Last Updated: 5/6/2022