Mission Ridge Chair 5 Project

The purpose of this project is to implement a project approved in the Mission Ridge Master Plan EA to install a new chair lift within the existing special use permit and ski area boundary (ref. pg. 16, 1.2.3.3 Bowl Four Lift -now called Chair 5.

Project Summary

Last Updated: 3/3/2025