Chelan County Distribution and Transmission Line Pole Replacement
Replacement of 4 distribution and 2 transmission line poles
Project Summary
Location Summary:
Tumwater Canyon distribution line poles - Sections 4, 9 and 10 of T24N, R17E, WM. Section 33 of T25N, R17E, WM. Yodelin transmission line poles- Section 12 of T26N, R13E, WM
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 12/02/2019 |
Decision | 10/2020 (Estimated) |
Implementation | 10/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Wenatchee River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Chelan County Distribution and Transmission Line Pole Replacement
Decision Signed Date: 10/16/2020
Forests:
Okanogan-Wenatchee National Forest
Districts:
Wenatchee River Ranger District
States:
Washington
Counties:
Chelan
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kevin Smith
600 Sherbourne
Leavenworth, WA 98826
509-548-2585
kwsmith@fs.fed.us
Last Updated: 12/9/2020