Fairpoint Communications SR 65 underground line upgrade
Burying fiber optic cable 42 inches deep within existing corridor 9 feet off of SR 65 pavement using a vibratory plow.
Project Summary
Location Summary:
SR 65 from Sumatra to Vilas, 16 miles
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 09/27/2013 |
| Comment Period | 10/30/2013 |
| Decision | 12/2013 (Estimated) |
| Implementation | 12/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Apalachicola Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
FairPoint Communications Fiber Optic Line SR 65
Decision Signed Date: 12/03/2013
Legal Notice Date: 12/03/2013
Forests:
National Forests In Florida
Districts:
Apalachicola Ranger District
States:
Florida
Counties:
Liberty
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Sherry Gaston
P.O. Box 579
Bristol, FL 32321
850-926-3561ex t6511
sgaston@fs.fed.us
Last Updated: 12/9/2013