Skip to main content

TALQUIN ELECTRIC HOMEOWNERS POWER

The Apalachicola National Forest has received an application proposing the installation of approximately 1,265 Feet of a new underground conduit with an electric cable that will run from the existing powerline pole, through an existing firebreak.

Project Summary

Last Updated: 11/6/2020