Black Creek Bridge Repair and Replacement
This project looks to address two bridges that are in need of maintenance/replacement. The bridge replacement is proposed to occur at mile post 1.7 on forest service road (FSR) 100. The bridge repair will occur on FSR 120.
Project Summary
Location Summary:
FSR 120 and FSR 100
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/02/2021 |
Decision | 08/2021 (Estimated) |
Implementation | 08/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Apalachicola Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance; Road Improvements/Construction; Travel Management
Current Status:
Completed
Project Decision Information
Black Creek Bridge Repair and Replacement
Decision Signed Date: 08/17/2021
Forests:
National Forests In Florida
Districts:
Apalachicola Ranger District
States:
Florida
Counties:
Liberty
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Branden Tolver
P.O. Box 579
Bristol, FL 32321
936-344-6205
branden.tolver@usda.gov
Last Updated: 8/29/2022