Washburn Balsam Removal Project
The proposed project consists of the removal small balsam trees (majority of the trees are between 3-6 inches in diameter) on approximately 100 acres within two red pine stands.
Project Summary
Current Status:
Completed
Location Summary:
Stands are located on the southern end of the district near the Town of Drummond (Pigeon Lake)
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/04/2010 |
| Decision | 09/2010 (Estimated) |
| Implementation | 10/2010 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (6), 36 Cfr 220.6(E)(6)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Washburn Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Fuels Management
Project Activity:
Forest Vegetation Improvements
Project Decision Information
Washburn Balsam Removal Project Decision Memo
Decision Signed Date: 09/09/2010
Forests:
Chequamegon / Nicolet National Forest
Districts:
Washburn Ranger District
States:
Wisconsin
Counties:
Bayfield
Legal Land Description:
Township 45 North, Range 8 West, Section 17 /18 and Township 44 North, Range 8 West, Section 11
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jennifer Maziasz
113 Bayfield St. East
Washburn, WI 54891
715-373-2667
jmaziasz@fs.fed.us
Last Updated: 9/9/2010