Skip to main content

2015 Road-Stream Crossing Repair and Maintenance

Repair, replace and/or maintain culverts and bridges along existing roads and trails with identified drainage problems at 15 sites. Stabilize about 1.5 miles of FR 383 and 0.25 miles of FR 378A to reduce road surface erosion and sedimentation.

Project Summary

Last Updated: 3/13/2015