Skip to main content

Bayfield Electric SUP 2018

To replace about 3,000 ft of existing overhead powerline with a new underground line within the existing utility corridor. New buried cable would be within the existing right-of-way. Proposal includes the removal of overhead supporting infrastructure

Project Summary

Last Updated: 8/28/2018