2019 Bayfield Electric Line Burial
An amendment to the Special Use Permit to replace existing overhead powerline with a new underground line within the existing utility corridor right-of-way. Proposal includes the removal of overhead supporting infrastructure.
Project Summary
Current Status:
Completed
Location Summary:
Multiple locations on Great Divide and Washburn Ranger Districts
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/01/2019 |
| Decision | 09/2019 (Estimated) |
| Implementation | 09/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Chequamegon / Nicolet National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
2019 Bayfield Electric Line Burial
Decision Signed Date: 09/27/2019
Forests:
Chequamegon / Nicolet National Forest
Districts:
Great Divide Ranger District; Washburn Ranger District
States:
Wisconsin
Counties:
Bayfield
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Nicole Molitor
500 Hanson Lake Road
Rhinelander, WI 54501
715-634-4821, x 2327
nicole.g.molitor@usda.gov
Last Updated: 9/27/2019