Bayfield Peninsula Hydrogeology Project
The Forest Service and Wisconsin Geological Natural History Survey (WGNHS) are proposing to drill two boreholes, collect and describe the sediment, and install monitoring wells in the Bayfield Peninsula to better understand the area hydrogeology
Project Summary
Current Status:
Completed
Location Summary:
Two proposed drilling locations are located on the northern portion of the Washburn Ranger District near Moquah Barrens
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/15/2019 |
| Decision | 09/2019 (Estimated) |
| Implementation | 09/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Washburn Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Project Decision Information
Bayfield Peninsula Hydrogeology Project
Decision Signed Date: 09/30/2019
Forests:
Chequamegon / Nicolet National Forest
Districts:
Washburn Ranger District
States:
Wisconsin
Counties:
Bayfield
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jennifer Maziasz
113 Bayfield St. East
Washburn, WI 54891
715-373-2667
jmaziasz@fs.fed.us
Last Updated: 9/30/2019